Skip to main content

Research on the Construction of Evaluation System of the Hub General Plan of Train Disintegration and Assemblage System

  • Conference paper
  • First Online:
Advances in Smart Vehicular Technology, Transportation, Communication and Applications (VTCA 2018)

Part of the book series: Smart Innovation, Systems and Technologies ((SIST,volume 129))

  • 624 Accesses

Abstract

Through the analysis of the composition of the hub general plan of train disintegration and assemblage system, and the operation flow of the three sub-systems such as arrive, disintegration and assemblage and departure, established an evaluation system covering the scale of capability, production efficiency, feasibility and sustainability. This paper gives the definitions and calculation methods of the 15 indicators of the evaluation system, and hope to provide reference for improving the planning and evaluation of the disintegration and assemblage system.

This research was supported by the National Natural Science Foundation of China (Project No. 61403317, 61703351), National Key Research and Development Program of China (2017YFB1200702, 2016YFC0802208), Science and Technology Plan of Sichuan province (Project NO. 2017ZR0149, 2017RZ0007), and Science and Technology Plan of China Railway Corporation (Project No.: 2016X006-D), and the Fundamental Research Funds for the Central Universities (2682017ZDPY04, 2682017CX022, 2682017CX018).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Gao, Y.H.: Construction of Economic Evaluation Index System of Marshalling Yard in China. Beijing Jiaotong University (2012)

    Google Scholar 

  2. Yin, Y.: Study on Layout Planning Method and Adjustment Strategy of Railway Marshalling Station. Southwest Jiaotong University (2007)

    Google Scholar 

  3. Lei, Z.L.: Study on the evaluation system of general plan of railway rub. J. Railway Eng. Soc. 33(02), 1–5 (2016)

    Google Scholar 

  4. Zhou, T.L.: Study on general layout plan of Chengdu railway hub. Railway Transp. Econ. 38(06), 49–53+100 (2016)

    Google Scholar 

  5. Li, S.: Research on the Relationship Between Railway Marshalling Station Layout and Traffic Organization. Beijing Jiaotong University (2014)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Tao Chen .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Deng, B., Chen, T., Shi, F., Wang, C. (2019). Research on the Construction of Evaluation System of the Hub General Plan of Train Disintegration and Assemblage System. In: Ni, S., Wu, TY., Chang, TH., Pan, JS., Jain, L. (eds) Advances in Smart Vehicular Technology, Transportation, Communication and Applications. VTCA 2018. Smart Innovation, Systems and Technologies, vol 129. Springer, Cham. https://doi.org/10.1007/978-3-030-04582-1_26

Download citation

Publish with us

Policies and ethics