Skip to main content

Modeling Power of the Framework

  • Chapter
  • First Online:
The Resource Transfer Problem

Part of the book series: Contributions to Management Science ((MANAGEMENT SC.))

  • 492 Accesses

Abstract

In this chapter, we explain how to use the resource transfer problem as a modeling framework for scheduling and routing problems. We will show that the resource transfer problem allows the modeling of many different types of scheduling problem, a large variety of vehicle routing problems, as well as their combinations to integrated problems. Section 4.1 is devoted to scheduling problems. We proceed with modeling vehicle routing problems in Sect. 4.2 and study integrated scheduling and routing problems in Sect. 4.3. In the last section, we summarize different modeling techniques which can be used as building blocks when modeling different types of scheduling and routing problem.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Bartels JH, Zimmermann J (2009) Scheduling tests in automative R&D projects. Eur J Oper Res 193(3):805–819

    Article  Google Scholar 

  • Bartusch M, Möhring RH, Radermacher FJ (1988) Scheduling project networks with resource constraints and time windows. Ann Oper Res 16(1–4):201–240

    Google Scholar 

  • Bellenguez-Morineau O, Néron E (2008) Multi-mode and multi-skill project scheduling problem. In: Artigues C, Demassey S, Néron E (eds) Resource-constrained project scheduling: models, algorithms, extensions and applications. ISTE, London, pp 149–160

    Chapter  Google Scholar 

  • BÅ‚ażewicz J, Lenstra JK, Rinnooy Kan AHG (1983) Scheduling subject to resource constraints: classification and complexity. Discrete Appl Math 5(1):11–24

    Article  Google Scholar 

  • Brucker P, Knust S (2001) Resource-constrained project scheduling and timetabling. In: Burke E, Erben W (eds) Practice and theory of automated timetabling III: third international conference, PATAT 2000 Konstanz, August 16–18, 2000 Selected Papers. Lecture notes in computer science, vol 2079. Springer, Berlin, pp 277–293

    Chapter  Google Scholar 

  • Brucker P, Knust S (2012) Complex scheduling, 2nd edn. Springer, Berlin

    Book  Google Scholar 

  • Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207(1):1–14

    Article  Google Scholar 

  • Irnich S, Toth P, Vigo D (2014a) The family of vehicle routing problems. In: Toth P, Vigo D (eds) Vehicle routing: problems, methods, and applications, 2nd edn. SIAM, Philadelphia, pp 1–33

    Google Scholar 

  • Kolisch R, Meyer K (2006) Selection and scheduling of pharmaceutical research projects. In: Józefowska J, WÈ©glarz J (eds) Perspectives in modern project scheduling. Springer Science+Business Media, New York, pp 321–344

    Google Scholar 

  • Krüger D, Scholl A (2010) Managing and modelling general resource transfers in (multi-)project scheduling. OR Spectr 32(2):369–394

    Article  Google Scholar 

  • Mika M, Waligóra G, WÈ©glarz J (2006) Modelling setup times in project scheduling. In: Józefowska J, WÈ©glarz J (eds) Perspectives in modern project scheduling. Springer Science+Business Media, New York, pp 131–163

    Google Scholar 

  • Nemati S, Shylo OV, Prokopyev OA, Schaefer AJ (2016) The surgical patient routing problem: a central planner approach. INFORMS J Comput 28(4):657–673

    Article  Google Scholar 

  • Neumann K, Schwindt C (1995) Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. Technical Report WIOR-447, University of Karlsruhe

    Google Scholar 

  • Neumann K, Schwindt C (1997) Projects with minimal and maximal time lags: construction of activity-on-node networks and applications. OR Spektr 19(3):205–217

    Article  Google Scholar 

  • Parragh SN, Doerner KF, Hartl RF (2008a) A survey on pickup and delivery problems Part I: transportation between customers and depot. J Betriebswirt 58(1):21–51

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Weiss, I. (2019). Modeling Power of the Framework. In: The Resource Transfer Problem. Contributions to Management Science. Springer, Cham. https://doi.org/10.1007/978-3-030-02538-0_4

Download citation

Publish with us

Policies and ethics