Abstract
Part V deals with the simultaneous operational planning and maintenance of the utility and production systems of a process industry. In this chapter, a general optimization framework is presented with the main purpose of reducing the energy needs and material resources utilization of the overall system. The proposed mathematical model focuses mainly on the utility system and considers for the utility units: (i) unit commitment constraints, (ii) performance degradation and recovery, (iii) different types of cleaning tasks (online or offline, and fixed or flexible time window), (iv) alternative options for cleaning tasks in terms of associated durations, cleaning resources requirements and costs, and (v) constrained availability of resources for cleaning operations. The optimization function includes the operating costs for utility and production systems, cleaning costs for utility systems, and energy consumption costs. Several industrial-inspired case studies are presented in order to highlight the applicability and the significant benefits of the proposed approach. In particular, in comparison with the traditional sequential planning approach for production and utility systems, the proposed integrated approach can achieve considerable reductions in startup/shutdown and cleaning costs, and most importantly in utilities purchases, as it is shown in one of the case studies.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Kopanos GM, Pistikopoulos EN (2014) Reactive scheduling by a multiparametric programming rolling horizon framework: a case of a network of combined heat and power units. Ind Eng Chem Res 53(11):4366–4386
Kopanos GM, Laínez JM, Puigjaner L (2009) An efficient mixed-integer linear programming scheduling framework for addressing sequence-dependent setup issues in batch plants. Ind Eng Chem Res 48(13):6346–6357
Kopanos GM, Puigjaner L, Georgiadis MC (2010a) Optimal production scheduling and lot-sizing in dairy plants: the yoghurt production line. Ind Eng Chem Res 49(2):701–718
Kopanos GM, Méndez CA, Puigjaner L (2010b) MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: a benchmark scheduling problem of the pharmaceutical industry. Eur J Oper Res 207(2):644–655
Kopanos GM, Puigjaner L, Maravelias CT (2011a) Production planning and scheduling of parallel continuous processes with product family considerations. Ind Eng Chem Res 50:1369–1378
Kopanos GM, Puigjaner L, Georgiadis MC (2011b) Resource-constrained production planning in semicontinuous food industries. Comput Chem Eng 35(12):2929–2944
Kopanos GM, Puigjaner L, Georgiadis MC (2011c) Production scheduling in multiproduct multistage semicontinuous food processes. Ind Eng Chem Res 50(10):6316–6324
Kopanos GM, Puigjaner L, Georgiadis MC (2012a) Simultaneous production and logistics operations planning in semicontinuous food industries. OMEGA Int J Manage Sci 40:634–650
Kopanos GM, Puigjaner L, Georgiadis MC (2012b) Efficient mathematical frameworks for detailed production scheduling in food processing industries. Comput Chem Eng 42(SI):206–216
Kopanos GM, Xenos DP, Pistikopoulos EN, Thornhill NF (2015) Optimization of a network of compressors in parallel: operational and maintenance planning—the air separation plant case. Appl Energy 146:453–470
Xenos D, Kopanos GM, Cicciotti M, Thornhill NF (2016) Operational optimization of networks of compressors considering condition-based maintenance. Comput Chem Eng 84:117–131
Zulkafli NI, Kopanos GM (2016) Planning of production and utility systems under unit performance degradation and alternative resource-constrained cleaning policies. Appl Energy 183:577–602
Zulkafli NI, Kopanos GM (2017) Integrated condition-based planning of production and utility systems under uncertainty. J Clean Prod 167:776–805
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this chapter
Cite this chapter
Kopanos, G.M., Puigjaner, L. (2019). Integrated Operational and Maintenance Planning of Production and Utility Systems. In: Solving Large-Scale Production Scheduling and Planning in the Process Industries. Springer, Cham. https://doi.org/10.1007/978-3-030-01183-3_9
Download citation
DOI: https://doi.org/10.1007/978-3-030-01183-3_9
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-01182-6
Online ISBN: 978-3-030-01183-3
eBook Packages: EngineeringEngineering (R0)