Skip to main content

Measuring Change in Software Projects Through an Earned Value Lens

  • Conference paper
  • First Online:
Software Process Improvement and Capability Determination (SPICE 2018)

Abstract

Earned Value Management (EVM) is a common performance management tool for project management. EVM enables depicting the project progress in terms of scope, cost and schedule and provides future predictions based on trends and patterns. Even though EVM is widely used in various disciplines like manufacturing and construction, it is not common in software industry. One reason for this underutilization is the mismatch of an inherent nature of the software projects and the traditional EVM. Traditional EVM ignores change effort but it is predominant in software projects. We have developed cEVM as an extension to the traditional EVM to incorporate change and subsequent rework and evolution costs to measure earned value in software development projects more accurately. In this study, we focus on two applications of cEVM we performed to explore the usability of cEVM and to compare cEVM with traditional EVM. This paper discusses the results of the case studies as well as benefits and difficulties of cEVM.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Anbari, F.: Earned value project management method and extensions. Proj. Manag. J. 34(4), 12–13 (2003)

    Article  Google Scholar 

  2. Efe, P., Demirors, O.: Applying EVM in a software company: benefits and difficulties. In: Proceedings of the 39th EUROMICRO Conference on Software Engineering and Advanced Applications (SEAA), Santander, Spain (2013)

    Google Scholar 

  3. Cass, A.G., Sutton, S.M., Osterweil, L.J.: Formalizing rework in software processes. In: Oquendo, F. (ed.) EWSPT 2003. LNCS, vol. 2786, pp. 16–31. Springer, Heidelberg (2003). https://doi.org/10.1007/978-3-540-45189-1_3

    Chapter  Google Scholar 

  4. Twentyman, J.: The crippling costs of IT project rework. Inside Knowledge, 15 June 2005

    Google Scholar 

  5. Charette, R.N.: Why software fails. IEEE Spectr. 42(9), 42–49 (2005)

    Article  Google Scholar 

  6. Uskarci, A., Demirors, O.: Do staged maturity models result in organization-wide continuous process improvement? Insight from employees. Comput. Stand. Interfaces 52, 25–40 (2017)

    Article  Google Scholar 

  7. Ebert, C., Dumke, R.: Software Measurement: Establish - Extract -Evaluate - Execute. Springer, Berlin (2010). https://doi.org/10.1007/978-3-540-71649-5

    Book  MATH  Google Scholar 

  8. Laporte, C.Y., Berrhouma, N., Doucet, M., Palza-Vargas, E.: Measuring the cost of software quality of a large software project at bombardier transportation. Softw. Qual. Prof. J. 14(3), 14–31 (2012)

    Google Scholar 

  9. Coskuncay, A., Demirors, O.: Software development in Turkey. IT Prof. 17(3), 10–13 (2015)

    Article  Google Scholar 

  10. VersionOne: 12th Annual State of Agile (2018). https://explore.versionone.com/state-of-agile/versionone-12th-annual-state-of-agile-report

  11. Efe, P., Demirors, O.: A change oriented model for earned value management and its application in software development projects. IEEE Trans. Softw. Eng. in review

    Google Scholar 

  12. ANSI/EIA -748A: American National Standard Institute/Electronic Industries Alliance/Standard for Earned Value Management Systems (1998)

    Google Scholar 

  13. AS 4817-2006: Project performance measurement using Earned Value (2006)

    Google Scholar 

  14. Project Management Institute: A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 1st edn. Newtown Square (2000)

    Google Scholar 

  15. Project Management Institute: A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 6th edn. Newtown Square (2017)

    Google Scholar 

  16. Project Management Institute: Practice Standard for Earned Value Management. Project Management Institute, Newtown Square (2005)

    Google Scholar 

  17. Cockburn, A.: Crystal Clear: A Human-Powered Methodology for Small Teams. Pearson Education Inc., Upper Saddle River (2005)

    Google Scholar 

  18. Sulaiman, T., Barton, B., Blackburn, T.: AgileEVM – earned value management in scrum projects. In: Proceedings of AGILE 2006 Conference, Minnesota, USA (2006)

    Google Scholar 

  19. An Industry Practice Guide for Agile on Earned Value Management Programs, version 1.2, National Defense Industrial Association, 26 March 2018

    Google Scholar 

  20. Project Management Institute: Practice Standard for Earned Value Management. Newtown Square (2011)

    Google Scholar 

  21. Efe, P.: Quality Integrated Earned Value Management. Ph. D. dissertation, Middle East Technical University (2015). etd.lib.metu.edu.tr/upload/12619220/index.pdf

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Pinar Efe .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Efe, P., Demirors, O., Benetallah, B. (2018). Measuring Change in Software Projects Through an Earned Value Lens. In: Stamelos, I., O'Connor, R., Rout, T., Dorling, A. (eds) Software Process Improvement and Capability Determination. SPICE 2018. Communications in Computer and Information Science, vol 918. Springer, Cham. https://doi.org/10.1007/978-3-030-00623-5_14

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-00623-5_14

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-00622-8

  • Online ISBN: 978-3-030-00623-5

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics