Abstract
All processes, and the work they involve, have a context. In Chap. 2 we introduced two distinct contexts for work: the project environment and the operational environment. In this chapter we examine the project environment from four perspectives: chronology (a sequence of phases), structure (a taxonomy of components), organisation (a model of governance) and engagement (management of stakeholders). In our discussion of structure, we draw an important distinction between deliverables-related activity and management-related activity. Although the overwhelming bulk of work arising from a project is “below-the-line” (required to produce, deliver and implement the deliverables identified in the scoping statement), the project environment is shaped by the demands of “above-the-line” work (required to plan and manage the project). To accommodate these demands, we define, describe and apply a general model, regardless of the nature of the project. The peculiarities of particular projects can be accommodated by adapting this common model.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2011 Springer-Verlag London Limited
About this chapter
Cite this chapter
Zwikael, O., Smyrk, J. (2011). The Project Environment. In: Project Management for the Creation of Organisational Value. Springer, London. https://doi.org/10.1007/978-1-84996-516-3_4
Download citation
DOI: https://doi.org/10.1007/978-1-84996-516-3_4
Publisher Name: Springer, London
Print ISBN: 978-1-84996-515-6
Online ISBN: 978-1-84996-516-3
eBook Packages: EngineeringEngineering (R0)