Skip to main content
  • 4476 Accesses

Abstract

If the project involves an improvement to existing systems, the term “control” is used to refer to the final six sigma project phase in which tentative recommendations are confirmed and institutionalized. This follows because inspection controls are being put in place to confirm that the changes do initially increase quality and that they continue to do so. If the associated project involves new product or service design, this phase also involves confirmation. Since there is less emphasis on evaluating a process on an on-going basis, the term “verify” refers evaluation on a one-time, off-line basis.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 99.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Reference

  • Dodge HF, Romig HG (1959) Sampling Inspection Tables, Single and Double Sampling, 2nd edn. Wiley, New York

    MATH  Google Scholar 

Download references

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag London Limited

About this chapter

Cite this chapter

(2010). Control or Verify Phase. In: Introduction to Engineering Statistics and Lean Sigma. Springer, London. https://doi.org/10.1007/978-1-84996-000-7_7

Download citation

  • DOI: https://doi.org/10.1007/978-1-84996-000-7_7

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-84882-999-2

  • Online ISBN: 978-1-84996-000-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics