Abstract
If the project involves an improvement to existing systems, the term “control” is used to refer to the final six sigma project phase in which tentative recommendations are confirmed and institutionalized. This follows because inspection controls are being put in place to confirm that the changes do initially increase quality and that they continue to do so. If the associated project involves new product or service design, this phase also involves confirmation. Since there is less emphasis on evaluating a process on an on-going basis, the term “verify” refers evaluation on a one-time, off-line basis.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Reference
Dodge HF, Romig HG (1959) Sampling Inspection Tables, Single and Double Sampling, 2nd edn. Wiley, New York
Rights and permissions
Copyright information
© 2010 Springer-Verlag London Limited
About this chapter
Cite this chapter
(2010). Control or Verify Phase. In: Introduction to Engineering Statistics and Lean Sigma. Springer, London. https://doi.org/10.1007/978-1-84996-000-7_7
Download citation
DOI: https://doi.org/10.1007/978-1-84996-000-7_7
Publisher Name: Springer, London
Print ISBN: 978-1-84882-999-2
Online ISBN: 978-1-84996-000-7
eBook Packages: EngineeringEngineering (R0)