Abstract

A power system is usually divided into the subsystems of generation, transmission, and distribution facilities according to their functions. The distribution system is the most important part of a power system, which consists of many step-down transformers, distribution feeders, and customers. Therefore to evaluate the reliability of power distribution systems is a very complicated and tedious process. This chapter illustrates a reliability network equivalent technique for complex radial distribution system reliability evaluation. This method avoids the required procedure of finding the failure modes and their effect on the individual load points and results in a significant reduction in computer solution time. A time-sequential simulation technique is also introduced in this chapter. In the simulation technique, the direct search technique is used and overlapping time is considered. The simulation technique evaluates the reliability indices by a series of trials and therefore the procedure is more complicated and requires longer computer time. The simulation approach can provide both the average values and probability distributions of the load point and system indices. It may be practical therefore to use the analytical technique for basic system evaluation and to use the simulation technique when additional information is required.

References

  1. 1.
    Allan RN, Billinton R, Lee SH (1984) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans PAS 103(2):275–282Google Scholar
  2. 2.
    Allan RN, Billinton R, Shahidehpour SM, Singh C (1988) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans Power Syst 3(4):1555–1564CrossRefGoogle Scholar
  3. 3.
    Allan RN, Billinton R, Breipohl AM, Grigg CH (1994) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans Power Syst 9(1):41–49CrossRefGoogle Scholar
  4. 4.
    Allan RN, Bhuiyan MR (1993) Effects of failure and repair process distribution on composite system adequacy indices in sequential Monte Carlo simulation. Proceedings of the joint international IEEE power conference, Power Tech. IEEE, Los Alamitos, CA, USA, pp 622–628Google Scholar
  5. 5.
    Allan RN, Billinton R, Sjarief I, Goel L et al. (1991) A reliability test system for educational purpose-basic distribution system data and results. IEEE Trans Power Syst 6(2):823–831CrossRefGoogle Scholar
  6. 6.
    Billinton R, Allan RN (1996) Reliability evaluation of power systems, 2nd edn. Plenum Press, New YorkGoogle Scholar
  7. 7.
    Billinton R, Allan RN (1990) Basic power system reliability concepts. Reliab Eng Syst Saf 27:365–384CrossRefGoogle Scholar
  8. 8.
    Billinton R, Allan RN, Salvaderi L (1988) Applied reliability assessment in electric power systems. Institute of Electrical and Electronics Engineers, New YorkGoogle Scholar
  9. 9.
    Billinton R, Wang P (1998) Distribution system reliability cost/worth analysis using analytical and sequential simulation techniques. IEEE Trans Power Syst 13(4):1245–1250CrossRefGoogle Scholar
  10. 10.
    Billinton R, Billinton JE (1989) Distribution system reliability indices. IEEE Trans Power Deliv 4(1):561–568CrossRefGoogle Scholar
  11. 11.
    Billinton R, Wacker G, Wojczynski E (1983) Comprehensive bibliography of electrical service interruption costs. IEEE Trans PAS 102:1831–1837Google Scholar
  12. 12.
    Billinton R (1972) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans PAS 91(2):649–660Google Scholar
  13. 13.
    Billinton R, Grover MS (1975) Reliability assessment of transmission system and distribution systems. IEEE Trans PAS 94(3):724–732Google Scholar
  14. 14.
    Billinton R, Grover MS (1975) Quantitative evaluation of permanent outages in distribution systems. IEEE Trans PAS 94(3):733–741Google Scholar
  15. 15.
    Billinton R, Grover MS (1974) A computerized approach to substation and switching station reliability evaluation. IEEE Trans PAS 93(5):1488–1497Google Scholar
  16. 16.
    Billinton R, Goel R (1986) An analytical approach to evaluate probability distribution associated with the reliability indices of electrical distribution systems. IEEE Trans Power Deliv 1(3):145–251CrossRefGoogle Scholar
  17. 17.
    Billinton R, Wojczynski E (1985) Distribution variation of distribution system reliability indices. IEEE Trans PAS 104:3152–3160Google Scholar
  18. 18.
    Billinton R, Wang P (1995) A generalized method for distribution system reliability evaluation. Conference proceedings, IEEE WESCANEX. IEEE, Los Alamitos, CA, USA, pp 349–354Google Scholar
  19. 19.
    Billinton R, Wang P (1999) Teaching distribution system reliability evaluation using Monte Carlo simulation. IEEE Trans Power Syst 14(2):397–403CrossRefGoogle Scholar
  20. 20.
    Billinton R, Cui L, Pan Z, Wang P (2002) Probability distribution development in distribution system reliability evaluation. Electric Power Compon Syst 30(9):907–916CrossRefGoogle Scholar
  21. 21.
    Billinton R, Wang P (1998) Reliability-network-equivalent approach to distribution system reliability evaluation. IEE Proc Gener Transm Distrib 145(2):149–153CrossRefGoogle Scholar
  22. 22.
    Billinton R, Wang P (1999) Deregulated power system planning using a reliability network equivalent technique. IEE Proc Gener Transm Distrib 146(1):25–30CrossRefGoogle Scholar
  23. 23.
    Billinton R, Allan RN (1984) Reliability evaluation of engineering systems. Plenum Press, New YorkGoogle Scholar
  24. 24.
    Billinton R, Jonnavithula S (1997) A test system for teaching overall power system reliability assessment. IEEE Trans Power Syst 11(4):1670–1676CrossRefGoogle Scholar
  25. 25.
    Brown RE, Hanson AP (2001) Impact of two-stage service restoration on distribution reliability. IEEE Trans Power Syst 16(4):624–629CrossRefGoogle Scholar
  26. 26.
    Ding Y, Wang P, Goel L, Billinton R, Karki R (2007) Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques. Electric Power Syst Res 77(12):1665–1671Google Scholar
  27. 27.
    Durga Rao K, Kushwaha HS, Verma AK, Srividya A (2007) Simulation based reliability evaluation of AC power supply system of Indian nuclear power plant. Int J Qual Reliab Manag 24(6):628–642CrossRefGoogle Scholar
  28. 28.
    Durga Rao K, Gopika V, Rao VVSS et al. (2009) Dynamic fault tree analysis using Monte Carlo simulation in probabilistic safety assessment. Reliab Eng Syst Saf 94(4):872–883CrossRefGoogle Scholar
  29. 29.
    Goel L, Billinton R (1991) Evaluation of interrupted energy assessment rates in distribution systems. IEEE Trans Power Deliv 6(4):1876–1882CrossRefGoogle Scholar
  30. 30.
    Goel L, Ren S, Wang P (2001) Modeling station-originated outages in composite system using state duration sampling simulation approach. Comput Electr Eng 27(2):119–132zbMATHCrossRefGoogle Scholar
  31. 31.
    Henley EJ, Hiromitsu K (1981) Reliability engineering and risk assessment. Prentice-Hall, Englewood Cliffs, NJGoogle Scholar
  32. 32.
    IEEE Subcommittee on the Application of Probability Methods. Power System Engineering Committee (1978) Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans PAS 97(6):2235–2242Google Scholar
  33. 33.
    Li W, Wang P, Li Z, Liu Y (2004) reliability evaluation of complex radial distribution systems considering restoration sequence and network constraints. IEEE Trans Power Deliv 19(2):753–758CrossRefGoogle Scholar
  34. 34.
    Rubinstein RY (1981) Simulation and Monte Carlo method. Wiley, New YorkzbMATHCrossRefGoogle Scholar
  35. 35.
    Tollefson G, Billinton R, Wacker G (1991) Comprehensive bibliography on reliability worth and electrical service interruption costs. IEEE Trans Power Syst 6(4):1980–1990CrossRefGoogle Scholar
  36. 36.
    Ubeda R, Allan RN (1992) Sequential simulation applied to composite system reliability evaluation. IEE Proc C 139(2):81–86Google Scholar
  37. 37.
    Wang P, Li W (2007) Reliability evaluation of distribution systems considering optimal restoration sequence and variable restoration times. IET Proc Gener Transm Distrib 1(4):688–695CrossRefGoogle Scholar
  38. 38.
    Wang P, Billinton R (2001) Impacts of station-related failures on distribution system reliability. Electr Mach Power Syst 29:965–975CrossRefGoogle Scholar
  39. 39.
    Wang P, Billinton R (2002) Reliability cost/worth assessment of distribution system incorporating time varying weather conditions and restoration resources. IEEE Trans Power Deliv 17(1):260–265CrossRefGoogle Scholar
  40. 40.
    Wang P, Billinton R (1999) Time-sequential distribution system reliability worth analysis considering time varying load and cost models. IEEE Trans Power Deliv 14(3):1046–1051CrossRefGoogle Scholar
  41. 41.
    Wang P, Billinton R (2001) Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as an alternative supply. IEE Proc Gener Transm Distrib 148(4):355–360CrossRefGoogle Scholar
  42. 42.
    Wang P, Goel L, Billinton R (2000) Evaluation of probability distributions of distribution system reliability indices considering WTG as alternative supply. Electr Mach Power Syst 28:901–913CrossRefGoogle Scholar
  43. 43.
    Zio E, Marella M, Podollini L (2007) A Monte Carlo simulation approach to the availability assessment of multi-state systems with operational dependencies. Reliab Eng Syst Saf 92:871–882CrossRefGoogle Scholar

Copyright information

© Springer-Verlag London Limited 2010

Authors and Affiliations

  • Peng Wang
    • 1
  • Lalit Goel
    • 1
  1. 1.Power Engineering Division, Electrical and Electronic Engineering SchoolNanyang Technological UniversitySingaporeSingapore

Personalised recommendations