Skip to main content

Part of the book series: Springer Series in Reliability Engineering ((RELIABILITY))

Abstract

In this chapter we present a modelling tool that was created to model the problems of inspection maintenance and planned maintenance interventions, namely delay time modelling (DTM). This concept provides a modelling framework readily applicable to a wide class of actual industrial maintenance problems of assets in general, and inspection problems in particular.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

14.9 References

  • Abdel-Hameed, M., (1995), Inspection, maintenance and replacement models, Computers and Operations Research, V22,4, 435–441

    Article  Google Scholar 

  • Akbarov, A., Wang W. and Christer A.H., (2006), Problem identification in the frame of maintenance modelling: a case study, to appear in I. J. Prod. Res.

    Google Scholar 

  • Baker, R.D. and Wang, W., (1991), Estimating the delay time distribution of faults in repairable machinery from failure data, IMA J. Maths. Applied in Business and Industry, 4, 259–282.

    Google Scholar 

  • Baker, R. and Wang, W., (1993), Developing and testing the delay time model, Journal of Operational Research Society, Vol. 44, No. 4, 361–374.

    Article  MATH  Google Scholar 

  • Barlow, R.E and Proschan, F., (1965), Mathematical theory of reliability, Wiley, New York.

    MATH  Google Scholar 

  • Carr, M.J., and Christer, A.H, (2003) Incorporating the potential for human error in maintenance models, J. Opl. Res. Soc., 54(12), 1249–1253

    Article  MATH  Google Scholar 

  • Christer, A.H., (1976), Innovative decision making, proceedings of NATO conference on the role of effectiveness of theory of decision in practice, eds. Bowen K.C and White D.J., Hodder and Stoughton, 368–377.

    Google Scholar 

  • Christer, A.H., (1999), Developments in delay time analysis for modeling plant maintenance, J. Opl. Res. Soc., 50, 1120–1137.

    Article  MATH  Google Scholar 

  • Christer, A.H. and Redmond, D.F., (1990), A recent mathematical development in maintenance theory, Int. J. Prod. Econ, 24, 227–234.

    Article  Google Scholar 

  • Christer, A.H. and Waller, W.M., (1984), Delay time Models of Industrial Inspection Maintenance Problems, J. Opl. Res. Soc., 35, 401–406.

    MATH  Google Scholar 

  • Christer, A.H and Wang, W., (1995), A delay time based maintenance model of a multi-component system, IMA Journal of Maths. Applied in Business and Industry, Vol. 6, 205–222.

    MATH  Google Scholar 

  • Christer, A.H and Whitelaw, J. (1983), An Operational Research approach to breakdown maintenance: problem recognition, J Opl Res Soc, 34, 1041–1052.

    Google Scholar 

  • Christer, A.H., Wang, W., Baker, R.D. and Sharp, J.M., (1995), Modelling maintenance practice of production plant using the delay time concept, IMA J. Maths. Applied in Business and Industry, Vol. 6, 67–83.

    MATH  Google Scholar 

  • Christer, A.H., Wang, W., Sharp, J.M. and Baker, R.D., (1997), A stochastic modelling problem of high-tech steel production plant, in Stochastic Modelling in Innovative Manufacturing, Lecture Notes in Economics and mathematical Systems, (Eds. by A.H Christer, Shunji Osaki and L. C. Thomas), Springer, Berlin, 196–214.

    Google Scholar 

  • Christer, A.H., Wang, W., Choi, K. and Sharp, J.M., (1998a), The delay-time modelling of preventive maintenance of plant given limited PM data and selective repair at PM, IMA J. Maths. Applied in Business and Industry, Vol. 9, 355–379.

    MATH  Google Scholar 

  • Christer, A.H., Wang, W., Sharp, J.M. and Baker, R.D., (1998b), A case study of modelling preventive maintenance of production plant using subjective data, J. Opl. Res. Soc., 49, 210–219.

    Article  MATH  Google Scholar 

  • Christer, A.H., Wang, W. and Lee, C., (2000), A data deficiency based parameter estimating problem and case study in delay time PM modelling, Int. J. Prod. Eco. Vol. 67, No. 1, 63–76

    Article  Google Scholar 

  • Christer, A.H. Wang, W., Choi, K. and Schouten, F.A., (2001), The robustness of the semi-Markov and delay time maintenance models to the Markov assumption, IMA. J. Management Mathematics, 12, 75–88.

    Article  MATH  Google Scholar 

  • Kaio, N. and Osaki, S., (1989), Comparison of Inspection Policies Journal of the Operational Research Society, Vol. 40, No. 5, 499–503

    Article  MATH  Google Scholar 

  • Luss, H., (1983), An Inspection Policy Model for Production Facilities, Management Science, Vol. 29, No. 9, 1102–1109

    Article  MATH  Google Scholar 

  • McCall, J., (1965), Maintenance Policies for Stochastically Failing Equipment: A Survey, Management Science, Vol. 11, No. 5, 493–524

    MathSciNet  Google Scholar 

  • Moubray, J., (1997), Reliability Centred Maintenance, Butterworth-Heineman, Oxford.

    Google Scholar 

  • Ross, (1983), Stochastic processes, Wiley, New York

    MATH  Google Scholar 

  • Taylor, H.M., and Karlin, S., (1998), An introduction to stochastic modeling, 3rd Ed., Academic press, San Diego.

    MATH  Google Scholar 

  • Thomas, L.C., Gaver, D.P. and Jacobs, P.A. (1991), Inspection Models and their application, IMA Journal of Management Mathematics, 3(4):283–303

    Article  Google Scholar 

  • Wang, W., (1997), Subjective estimation of the delay time distribution in maintenance modelling, European Journal of Operational Research, 99, 516–529.

    Article  MATH  Google Scholar 

  • Wang W., (2000), A model of multiple nested inspections at different intervals, Computers and Operations Research, 27, 539–558.

    Article  MATH  Google Scholar 

  • Wang W., (2006), Modelling the probability assessment of the system state using available condition information, to appear in IMA. J. Management Mathematics

    Google Scholar 

  • Wang W. and Christer A.H., (1997), A modelling procedure to optimise component safety inspection over a finite time horizon, Quality and Reliability Engineering International, 13, No. 4, 217–224.

    Article  Google Scholar 

  • Wang W. and Christer A.H., (2003), Solution algorithms for a multi-component system inspection model, Computers and OR, 30, 190–134.

    MathSciNet  Google Scholar 

  • Wang W. and Jia, X., (2007), A Bayesian approach in delay time maintenance model parameters estimation using both subjective and objective data, Quality Maintenance and reliability Int., 23, 95–105

    Article  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2008 Springer-Verlag London Limited

About this chapter

Cite this chapter

Wang, W. (2008). Delay Time Modelling. In: Complex System Maintenance Handbook. Springer Series in Reliability Engineering. Springer, London. https://doi.org/10.1007/978-1-84800-011-7_14

Download citation

  • DOI: https://doi.org/10.1007/978-1-84800-011-7_14

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-84800-010-0

  • Online ISBN: 978-1-84800-011-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics