Skip to main content

Integrating Manufacturing Process Planning with Scheduling via Operation-Based Time-Extended Negotiation Protocols

  • Conference paper
Complex Systems Concurrent Engineering

Abstract

It is proposed in this paper the on-line adaptation of process plan with alternatives, through the application of an operation-based time-extended negotiation protocol for decision-making about real-time routing of job orders of parts composed of machining operations in a job-shop environment. The protocol is modified from the contract net protocol to cater for the multiple tasks and many-to-many negotiations. The grouping of the machining operations enables reduction of setup times, resulting from the reduction of machines changes. For each part, all feasible routings are considered as alternative process plans, provided the different manufacturing times in each machine are taken into account. The time-extended negotiation period allows the visualization of all of the times involved in the manufacture of each part, including those times that are not considered in systems of this nature, such as the negotiation times among agents. Extensive experiments have been conducted in the system, and the performance measures, including routings, makespan and flow time, are compared with those obtained by the search technique based on the co-evolutionary algorithm.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

6 Citations and References

  1. Kim YK, Park K, Ko J. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling, Computers & Operations Research 2003; 30:1151–1171.

    Article  MATH  Google Scholar 

  2. Kim Y. A set of data for the integration of process planning and job shop scheduling, 2003. Available at: <http://syslab.chonnam.ac.kr/links/data-pp&s.doc>. Access on: Sept. 13th 2006.

    Google Scholar 

  3. Usher J. Negotiation-based routing in job shops via collaborative agents, Journal of Intelligent Manufacturing 2003; 14:485–558.

    Article  Google Scholar 

  4. Shen W, Wang L, Hao Q. Agent-Based Distributed Manufacturing Process Planning and Scheduling: A State-of-Art Survey, IEEE Transactions on Systems, Man and Cybernetics — Part C: Applications and Reviews 2006; 36: 563–571

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2007 Springer-Verlag London Limited

About this paper

Cite this paper

Zattar, I.C., Ferreira, J.C.E., Granado, J.G.G., de Sousa, C.H.B. (2007). Integrating Manufacturing Process Planning with Scheduling via Operation-Based Time-Extended Negotiation Protocols. In: Loureiro, G., Curran, R. (eds) Complex Systems Concurrent Engineering. Springer, London. https://doi.org/10.1007/978-1-84628-976-7_37

Download citation

  • DOI: https://doi.org/10.1007/978-1-84628-976-7_37

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-84628-975-0

  • Online ISBN: 978-1-84628-976-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics