Abstract
This chapter presents some of the issues concerning holonic manufacturing systems. It starts by presenting the current manufacturing scenario and trends and then provides some background information on the holonic concept and its application to manufacturing. The current limitations and future trends of manufacturing suggest more autonomous and distributed organisations for manufacturing systems; holonic manufacturing systems are proposed as a way to achieve such autonomy and decentralisation. After a brief literature survey, a specific research study is presented to handle scheduling in holonic manufacturing systems. This work is based on task and resource holons that cooperate with each other based on a variant of the contract net protocol that allow the propagation of constraints between operations in the execution plan. The chapter ends by presenting some challenges and future opportunities for research.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Kelly, K., 1999, New Rules for the New Economy: 10 Radical Strategies for a Connected World, Penguin, USA.
Kidd, P., 1994, Agile Manufacturing, Forging New Frontiers, Addison-Wesley.
NGM, 1997, Next Generation Manufacturing — A Framework for Action, Next Generation Project Report, Agility Forum.
Schonfeld, E., 1998, “The customised, digitised, have-it-your-way economy,” Fortune, 138(6), pp. 114–124.
Atkinson, R. and Court, R., 1998, The New Economy Index: Understanding America’s Economic Transformation, Technology, Innovation, and New Economy Project; Progressive Policy Institute, November 1998.
National Research Council, 1998, Visionary Manufacturing Challenges for 2020, National Academic Press, Washington, D.C.
Hunt, V., 1989, Computer-Integrated Manufacturing Handbook, Chapman & Hall.
Kusiak, A., 1990, Intelligent Manufacturing Systems, Prentice-Hall, Inc.
Solberg, J. and Kashyap, R., 1993, “ERC research in intelligent manufacturing systems,” In Proceedings of the IEEE, 81(1), pp. 25–41.
Valckenaers, P., Bonneville, F., Van Brussel, H., Bongaerts, L. and Wyns, J., 1994, “Results of the Holonic control system benchmark at K.U. Leuven,” In Proceedings of International Conference on Computer Integrated Manufacturing and Automation Technology, pp. 128–133.
Sousa, P., Silva, N., Heikkila, T., Kallingbaum, M. and Valcknaers, P., 2000, “Aspects of co-operation in distributed manufacturing systems,” Studies in Informatics and Control Journal, 9(2), pp. 89–110.
Tharumarajah, A., Wells, A. and Nemes, L., 1996, “Comparison of the Bionic, Fractal and Holonic manufacturing concepts,” International Journal of Computer Integrated Manufacturing, 9(3), pp. 217–226.
Monostori, L., 1997, “Editorial,” In Proceedings of the Second World Congress on Intelligent Manufacturing Processes & Systems (IMP&S’97), Monostori, L. (ed.), pp. vi–vii.
Hatvani, J. and Nemes, L., 1978, “Intelligent manufacturing systems — A tentative forecast,” In Proceedings of the VIIth IFAC World Congress, Niemi, A. (ed.), 2, pp. 895–899.
Hatvani, J., 1983, “The efficient use of deficient knowledge,” Annals of the CIRP, 32(1), pp. 423–425.
Valckenaers, P., Van Brussel, H., Bongaerts, L. and Wyns, J., 1997, “Holonic manufacturing systems,” Journal of Integrated Computer Aided Engineer, 4(3), pp. 191–201.
Koestler, A., 1967, The Ghost in the Machine. Hutchinson & Co, London, UK.
Simon, H., 1962, “The architecture of complexity,” In Proceedings of the American Philosophy Society, 106(6), pp. 467–482.
Simon, H., 1969, The Sciences of the Artificial, MIT Press, Cambridge, MA.
Höpf, M., 1994, “Holonic manufacturing systems — The basic concept and a report of IMS Test Case 5,” In Sharing CIM Solutions, Knudesen, J. et al. (eds.), IOS Press.
Langer, G., 1999, HoMuCS: A Methodology and Architecture for Holonic Multi-cell Control Systems, PhD Thesis, Technical University of Denmark, Department of Manufacturing Engineering.
Van Brussel, H., Wyns, J., Valckenaers, P., Bongaerts, L. and Peeters, P., 1998, “Reference architecture for Holonic manufacturing systems: PROSA,” Computers in Industry — Special Issue on Intelligent Manufacturing Systems, 31(3), pp. 255–276.
Wyns, J., 1999, Reference Architecture for Holonic Manufacturing Systems — the Key to Evolution and Reconfiguration, PhD Thesis, Production and Automation Division, Katholieke Universiteit Leuven, Leuven, Belgium.
Hayashi, H., 1993, “The IMS international collaborative program,” In Proceedings of the 24th International Symposium on Industrial Robots, Japan Industrial Robot Association.
Yoshikawa, H., 1993, “Intelligent manufacturing systems: technical cooperation that transcends cultural differences,” Information Infrastructure Systems for Manufacturing, IFIP Transactions, B-14, pp. 19–40.
ISC, 1994, IMS: Intelligent Manufacturing Systems — A Program for International Cooperation in Advanced Manufacturing, International Steering Committee Final Report (adopted at ISC6, Hawaii, USA, 24–26 January 1994; available at http://ksi.cpsc.ucalgary.ca/IMS/ISC/ISC94_Contents.html).
Barram, D., 1994, “Keynote address,” North American Symposium — Preparing for the Full-Scale IMS Program, June 23, 1994, Dallas, Texas, USA. (available at http://ksi.cpsc.ucalgary.ca/IMS/Dallas/IMS_Barram.html)
Bongaerts, L., 1998, Integration of Scheduling and Control in Holonic Manufacturing Systems, PhD Thesis, Production and Automation Division, Katholieke Universiteit Leuven, Leuven, Belgium.
van Leeuwen, E. and Norrie, D., 1997, “Holons and holarchies,” IEE Manufacturing Engineer, pp. 86–88.
Parunak, H., 1998, “What can agents do in industry and why?” In Proceedings of the Second International Conference on Co-operative Information Agents (CIA’98), Paris, France, 3–8 July 1998, pp. 1–18.
Kouiss, K., Pierreval, H. and Mebarki, N., 1997, “Using multi-agent architecture in FMS for dynamic scheduling,” Journal of Intelligent Manufacturing, 8, pp. 41–47.
Davis, R. and Smith, R., 1983, “Negotiation as a metaphor for distributed problem solving,” Artificial Intelligence, 20(1), pp. 63–109.
Smith, R., 1980, “The contract net protocol,” IEEE Transactions on Computers, C-29(12), pp. 1104–1113.
Bongaerts, L., Wyns, J., Detand, J., van Brussel, H. and Valckenaers, P., 1996, “Identification of manufacturing holons,” In Proceedings of the 1st European Workshop on Agent Oriented Systems in Manufacturing, Albayrak, S. and Bussmann, S. (eds.), pp. 57–73.
Gou, L., Luh, P. and Kyoya, Y. 1998, “Holonic manufacturing scheduling: architecture, cooperation mechanism, and implementation,” Computers in Industry, 37, pp. 213–231.
Leitao, P. and Barbosa, J., 2006, “Disturbance detection, recover and prediction in holonic manufacturing control,” In Proceedings of IEEE Workshop on Distributed Intelligent Systems: Collective Intelligence and Its Applications (DIS’06), pp. 133–138.
Walker, S., Brennan, R. and Norrie, D., 2005, “Holonic job shop scheduling using a multi-agent system”, IEEE Intelligent Systems, 20(1), pp. 50–57.
Kotak, D., Wu, S., Fleetwood, M. and Tamoto, H., 2003, “Agent-based holonic design and operations environment for distributed manufacturing,” Computers in Industry, 52(2), pp. 95–108.
Jarvis, J., Jarvis, D. and McFarlane, D., 2003, “Achieving holonic control: an incremental approach,” Computers in Industry, 51(2), pp. 211–223.
Huang, B., Gou, H., Liu, W., Li, Y. and Xie, M., 2002, “A framework for virtual enterprise control with the holonic manufacturing paradigm,” Computers in Industry, 49(3), pp. 299–310.
Babiceanu, R. and Chen, F., 2006, “Development and applications of holonic manufacturing systems: a survey,” Journal of Intelligent Manufacturing, 17, pp. 111–131.
Shen, W. and Norrie, D., 1999, “Agent-based systems for intelligent manufacturing: a state-of-the-art survey,” Knowledge and Information Systems, 1(2), pp. 129–156.
Shen, W., Wang, L. and Hao, Q., 2006, “Agent-based distributed manufacturing process planning and scheduling: a state-of-the-art survey,” IEEE Transactions on Systems, Man and Cybernetics, 36(4), pp. 563–577.
Sousa, P., Ramos, C. and Neves, J., 2000, “Manufacturing entities with incomplete information,” Studies in Informatics and Control Journal, 9(2), pp. 79–88.
Sousa, P. and Ramos, C., 1998, “A dynamic scheduling holon for manufacturing orders,” Journal of Intelligent Manufacturing — Special Issue on Agent based Manufacturing, 9(2), pp. 107–112.
Sousa, P. and Ramos, C., 1999, “A distributed architecture and negotiation protocol for scheduling in manufacturing systems,” Computers in Industry — Special Issue on Life Cycle Approaches to Production Systems: Management, Control and Supervision, 38(2), pp. 103–113.
Neves, J., Machado, J., Analide, C., Novais, P. and Abelha, A., 1997, “Extended logic programming applied to the specification of multi-agent systems and their computing environment,” In Proceedings of the 1997 IEEE International Conference on Intelligent Processing Systems, Beijing, China, pp. 159–164.
Traylor, B. and Gelfond, M., 1993, “Representing null values in logic programming,” In Proceedings of the International Logic Symposium (ILPS’93), Vancouver, Canada, pp. 341–352.
Sousa, P., Ramos, C. and Neves, J., 2003, “The Fabricare scheduling prototype suite: agent interaction and knowledge base,” Journal of Intelligent Manufacturing, 14(5), pp. 441–455.
Sousa, P., Ramos, C. and Neves, J., 2004, “The Fabricare system,” Production Planning & Control, 15(2), pp. 156–165.
Ramos, C., Almeida, A. and Vale, Z., 1995, “Scheduling manufacturing tasks considering due dates: a new method based on behaviours and agendas,” In Proceedings of the International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, pp.745–751.
Carriero, N. and Gelernter, D., 1989, “Linda in context,” Communications of the ACM, 32(4), pp. 444–458.
Carriero, N. and Gelernter, D., 1989, “How to write parallel programs: a guide to the perplexed,” ACM Computing Surveys, 21(3), pp. 323–357.
Sousa, P., 2006, “Using asynchronous messaging for agent-based development,” WSEAS Transactions on Computers, 5(6), pp. 1285–1292.
Almeida, A., 1995, Escalonamento Dinâmico de Tarefas Industriais Sujeitas a Prazos de Entrega, Dissertação de Mestrado, Faculdade de Engenharia da Universidade do Porto, Setembro de 1995. (MSc Thesis in Portuguese)
Sousa, P., 2000, Agentes Inteligentes em Sistemas Holónicos de Produção, Tese de Doutoramento, Universidade do Minho, Escola de Engenharia, Dezembro, 2000. (PhD Thesis in Portuguese)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2007 Springer-Verlag London Limited
About this chapter
Cite this chapter
Sousa, P., Ramos, C., Neves, J. (2007). Scheduling in Holonic Manufacturing Systems. In: Wang, L., Shen, W. (eds) Process Planning and Scheduling for Distributed Manufacturing. Springer Series in Advanced Manufacturing. Springer, London. https://doi.org/10.1007/978-1-84628-752-7_7
Download citation
DOI: https://doi.org/10.1007/978-1-84628-752-7_7
Publisher Name: Springer, London
Print ISBN: 978-1-84628-751-0
Online ISBN: 978-1-84628-752-7
eBook Packages: EngineeringEngineering (R0)