Abstract
The full-scale fire tests were separated into two categories: (1) external ignition of the Powerpack and (2) internal ignition of the Powerpack. For both tests, the Powerpack battery packs were charged to a full 100 % state of charge (SOC) prior to testing.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Notes
- 1.
HRR from the propane burners was determined based upon the flow rate of propane recorded by a mass flow meter during testing times the heat of combustion of propane.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2016 Fire Protection Research Foundation
About this chapter
Cite this chapter
Blum, A.F., Long, R.T. (2016). Testing Setup. In: Fire Hazard Assessment of Lithium Ion Battery Energy Storage Systems. SpringerBriefs in Fire. Springer, New York, NY. https://doi.org/10.1007/978-1-4939-6556-4_5
Download citation
DOI: https://doi.org/10.1007/978-1-4939-6556-4_5
Published:
Publisher Name: Springer, New York, NY
Print ISBN: 978-1-4939-6555-7
Online ISBN: 978-1-4939-6556-4
eBook Packages: Computer ScienceComputer Science (R0)