Skip to main content

Engineering Management of the Tamar Bridge

  • Chapter
Bridge Management
  • 403 Accesses

Abstract

The Tamar Bridge (Fig. 1) was constructed within the period 1959–61 as a private toll crossing for the Tamar Bridge and Torpoint Ferry Joint Committee, comprising representatives of the Cornwall County Council and the Plymouth City Council. Since the end of the maintenance period, the engineers responsible for the design and supervision of construction (Mott, Hay and Anderson) have been retained by the joint committee to undertake an annual inspection of the bridge and its immediate approaches, and to report and make recommendations on any necessary maintenance. Apartfrom small or ad hoc items arranged through the joint engineers, the county surveyor of Cornwall and the City Engineer of Plymouth, subsequent works have invariably been arranged and supervised by those same consultants who, through close liaison with the bridge owners and their staff, have effectively provided a professional service for the long-term management of maintenance activities by forecasting financial commitments and arranging the operations around the increasingly restrictive limitations imposed by traffic densities.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Tolled Crossings, Second Report from the Transport Committee, Session 1985–86. House of Commons 250-1. HMSO, London.

    Google Scholar 

  2. Truscott, R. P. and Warren, A. R., The Tamar crossings. Highways and Transportation, 35(5) (May 1988) 83–8.

    Google Scholar 

  3. Anderson, J. K., Tamar Bridge. Proc. Instn Civ. Engrs, 31 (August 1965) 337–60.

    Article  Google Scholar 

  4. Moser, K., Time-dependent response of suspension and cable stayed bridges. Proc. 8th Congress IABSE, New York, 1968, Final Report, pp. 119-29.

    Google Scholar 

  5. Department of the Environment, Housing and Construction Statistics Part 2, Quarterly, HMSO, London.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1990 Springer Science+Business Media Dordrecht

About this chapter

Cite this chapter

Halse, W.I., Stephens, R.L.C. (1990). Engineering Management of the Tamar Bridge. In: Harding, J.E., Parke, G.A.R., Ryall, M.J. (eds) Bridge Management. Springer, Boston, MA. https://doi.org/10.1007/978-1-4899-7232-3_15

Download citation

  • DOI: https://doi.org/10.1007/978-1-4899-7232-3_15

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-0-419-16050-2

  • Online ISBN: 978-1-4899-7232-3

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics