Abstract
The Tamar Bridge (Fig. 1) was constructed within the period 1959–61 as a private toll crossing for the Tamar Bridge and Torpoint Ferry Joint Committee, comprising representatives of the Cornwall County Council and the Plymouth City Council. Since the end of the maintenance period, the engineers responsible for the design and supervision of construction (Mott, Hay and Anderson) have been retained by the joint committee to undertake an annual inspection of the bridge and its immediate approaches, and to report and make recommendations on any necessary maintenance. Apartfrom small or ad hoc items arranged through the joint engineers, the county surveyor of Cornwall and the City Engineer of Plymouth, subsequent works have invariably been arranged and supervised by those same consultants who, through close liaison with the bridge owners and their staff, have effectively provided a professional service for the long-term management of maintenance activities by forecasting financial commitments and arranging the operations around the increasingly restrictive limitations imposed by traffic densities.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Tolled Crossings, Second Report from the Transport Committee, Session 1985–86. House of Commons 250-1. HMSO, London.
Truscott, R. P. and Warren, A. R., The Tamar crossings. Highways and Transportation, 35(5) (May 1988) 83–8.
Anderson, J. K., Tamar Bridge. Proc. Instn Civ. Engrs, 31 (August 1965) 337–60.
Moser, K., Time-dependent response of suspension and cable stayed bridges. Proc. 8th Congress IABSE, New York, 1968, Final Report, pp. 119-29.
Department of the Environment, Housing and Construction Statistics Part 2, Quarterly, HMSO, London.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1990 Springer Science+Business Media Dordrecht
About this chapter
Cite this chapter
Halse, W.I., Stephens, R.L.C. (1990). Engineering Management of the Tamar Bridge. In: Harding, J.E., Parke, G.A.R., Ryall, M.J. (eds) Bridge Management. Springer, Boston, MA. https://doi.org/10.1007/978-1-4899-7232-3_15
Download citation
DOI: https://doi.org/10.1007/978-1-4899-7232-3_15
Publisher Name: Springer, Boston, MA
Print ISBN: 978-0-419-16050-2
Online ISBN: 978-1-4899-7232-3
eBook Packages: Springer Book Archive