Advertisement

Power Supplies

  • David H. Parkinson
  • Brian E. Mulhall
Chapter
  • 58 Downloads
Part of the The International Cryogenics Monograph Series book series (INCMS)

Abstract

In setting up a magnet installation considerable engineering effort is needed for both the power supply and the cooling plant. For a 100-kOe facility we have seen that the power required is around 2 MW, and for 250 kOe around 12 MW, which is within the realm of heavy industrial equipment. Yet for some experiments the stability demanded may be that of precision laboratory equipment, being parts in 105 or even better for periods of a few minutes.

Keywords

Circuit Breaker Cryogenic System Carnot Cycle Electricity Tariff Cool Plant 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Science+Business Media New York 1967

Authors and Affiliations

  • David H. Parkinson
    • 1
    • 2
  • Brian E. Mulhall
    • 1
  1. 1.Royal Radar EstablishmentMalvernUK
  2. 2.University of BirminghamUK

Personalised recommendations