Abstract

Activation is the process of preparing people and a new or renovated facility for move-in and operation. It is a complex and little-understood process, particularly for hospitals, where the health, safety, and care of patients is the highest priority and where systems must be operational and fault-free on move day to safeguard a cost-efficient and smooth transition (especially when multi-phased construction and moves are involved). Activation includes the selection and ordering of equipment and supplies, the hiring of new staff, staff training, move planning, facility readiness, culminating in the move itself and facility operation. The challenge of the project described here was to clarify the meaning of activation, to develop an incipient “activation process model” and to demonstrate that activation brings a new focus to and expands the scope of the Post-Occupancy Evaluation (POE) process. This model describes the significant phases, steps, decisions, interdependencies, resources, policy and procedural guidance and time expenditure that are involved in activation.

Research for this project focused on in-depth study of a large facility which had recently activated. After the data gathering and document analysis phase, workshops were conducted with project and move coordinators from four similar facilities throughout the United States, two of which had recently been activated and two of which will activate new facilities within the next two years. These workshops provided a unique opportunity for “knowledge transfer” and action research by applying the lessons learned in facility activations to those future facilities that will benefit most from them. More importantly, the newly developed process model was critiqued by those who had undergone activation. The process model will be tested in facilities of varying complexity and scale around the country. The innovative process model views activation from the management perspective. With further development, it will evolve into a more detailed model that can be adapted and applied to the activation of any large and complex facility.

The post occupancy study of a facility’s construction and operation should be expanded to include the activation process. A successful activation is a key determinant of long-term operational success. The value of transmitting activation knowledge for organizations will be in the activation of new facilities, with improved training of personnel, better and more timely facility readiness, improved morale, and last but not least, significant savings in personnel, time and overall cost.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD   169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Bibliography

  • Architectural Research Consultants, 1988, VAMC Albuquerque, New Mexico Activation Process Evaluation, Albuquerque, NM, ARC, Inc.

    Google Scholar 

  • Boucher, M. P., and Hobbins, A. J., 1986, “Thorough Planning Creates Smooth Move for Parkwood Residents, Dimensions, November 1986, pp. 55–57.

    Google Scholar 

  • Bunning, R. L., 1982, “A Moving Orientation,” Hospital Topics, May/June 1982, pp. 26–29.

    Google Scholar 

  • Bunning, R. L., 1984, “Coping With Large-Scale Change,” Hospital Forum, May/June 1984, pp. 71, 72, 74.

    Google Scholar 

  • Galvagni, W., 1976, “Planning Facilities Moving Two Hospitals Into One New Center,” Hospitals, J.A.H.A., February 16, 1976, pp. 61–64.

    Google Scholar 

  • Handel, D. J., Hilling, L. N., and Lingo, K. H., 1983, “Transition Planning- An Integrated Approach,” HCM Review, Fall 1983, pp. 61–67.

    Google Scholar 

  • Hanlon, M. E., 1976, “Hospital Follows Two-Phase Plan for Move into New Building,” Hospitals, J.A.H.A., March 1, 1976, pp. 69–72.

    Google Scholar 

  • James, M. V., 1985, “How Pacific Bell Made Its Enormous Relocation Work,” Office Administration and Automation, June 1985, pp. 56–58, 60.

    Google Scholar 

  • Mark, K., and Rowe, C., 1982, “Minimizing the Problems of Hospital Relocation,” Dimensions, June 1982, pp. 22–23.

    Google Scholar 

  • National Institute of Building Sciences, 1985, Hospital User Manual Series Guidelines, Volume 1: VA Facility Description and Documentation Manual, working document, August 1985.

    Google Scholar 

  • National Instutite of Building Sciences, 1985, Hospital User Manual Series Guidelines, Volume 2: Systems Start-Up Manual, working document, August 1985.

    Google Scholar 

  • National Instutite of Building Sciences, 1987, Hospital User Manual Series Guidelines, Volume 3: Operations Manual, draft model, September 1987.

    Google Scholar 

  • National Instutite of Building Sciences, 1987, Hospital User Manual Series Guidelines, Volume 4: Maintenance Manual, draft model, September 1987.

    Google Scholar 

  • Roth, B. G., 1985, “Moving a Medical Center Library,” Special Libraries, Winter 1985, pp. 31–34.

    Google Scholar 

  • Saint Vincent Hospital, Santa Fe, New Mexico, 1977, Move-Related Materials.

    Google Scholar 

  • Vanderbilt University Medical Center, Nashville, Tennessee, 1980, Move-Related Materials.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1989 Springer Science+Business Media New York

About this chapter

Cite this chapter

Preiser, W.F.E., Petronis, J.P., Vigil, I.B. (1989). Towards an Activation Process Model. In: Preiser, W.F.E. (eds) Building Evaluation. Springer, Boston, MA. https://doi.org/10.1007/978-1-4899-3722-3_8

Download citation

  • DOI: https://doi.org/10.1007/978-1-4899-3722-3_8

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-1-4899-3724-7

  • Online ISBN: 978-1-4899-3722-3

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics