As discussed in Chapter 1, the basic function of an electric power system is to satisfy the system load and energy requirements as economically as possible and with a reasonable assurance of continuity and quality [1]. The two aspects of relatively low cost electrical energy at a high level of reliability are often in direct conflict and present power system managers, planners, and operators with a wide range of challenging problems. Electric power utilities are also facing increasing uncertainty regarding the economic, political, societal, and environmental constraints under which they operate and plan their future systems. This has created increasing requirements for extensive justification of new facilities and increased emphasis on the optimization of system costs and reliability. An integral element in the overall problem of allocating capital and operating resources is the assessment of reliability cost and reliability worth [2]. The ability to assess the costs associated with providing reliable service is reasonably well established and accepted [3, 4]. In contrast, the ability to assess the worth of providing reliable service is not well established and considerable work will be required before these methodologies can be considered to be completely acceptable. Establishing the worth of service reliability is a difficult and subjective task, as direct evaluation does not appear to be feasible at this time. A practical alternative, which is being widely utilized, is to evaluate the impacts and the monetary losses incurred by customers due to electric power supply failures.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Billinton, R., ‘Evaluation of reliability worth in an electric power system’, Reliability Engineering and System Safety, 46 (1994), pp. 15–23.
Wacker, G., Billinton, R., ‘Customer cost of electric interruption’, IEEE Proc., 77 (6) (1989), pp. 919–30.
Billinton, R., Allan, R. N., Reliability Assessment of Large Electric Power Systems, Kluwer, Boston (1988).
Billinton, R., Goel, L., ‘Overall adequacy assessment of an electric power system’, IEE Proc C., 139(1) (1992).
Billinton, R., Wacker, G., Wojczynski, E., ‘Comprehensive bibliography on electric service interruption costs’, IEEE Trans. Power Systems 102 (1983), pp. 1831–8.
Tollefson, G., Billinton, R., Wacker, G., ‘Comprehensive bibliography on reliability worth and electric service consumer interruption costs, 1980 – 1990’, IEEE Trans. Power Systems, 6(4) (1991), pp. 1508–14.
The value of service reliability to consumers. EPRI EA-4494, Res. Project 1104–6, Proceedings, May (1966).
Webb, M. G., ‘The determination of reserve generating capacity criteria in electricity supply systems’, Applied Economics, 9 (1977), pp. 19–31.
Shipley, R., Patton, A., Denison, J., ‘Power reliability cost vs. worth’, IEEE Trans. Power App. Syst., PAS-91, (1972), pp. 2204–12.
Myers, D., The Economic Effects to a Metropolitan Area of Power Outage Resulting from an Earthquake, Earthquake Engineering Systems Inc., San Francisco (1978).
Lundberg, L., Report of the Group of Experts on Quality of Service from the Customer’s Points of View, UNIPEDE, Rep. 60/D.1, 1972.
Munasinghe, M., ‘The costs incurred by residential electricity consumers due to power failures’, J. Consumer Res., 6 (1980).
Markel, L., Ross, N., Badertscher, N., Analysis of Electric Power System Reliability, California Energy Resources Conservation and Development Commission (1976).
Corwin, J., Miles, W., Impact Assessment of the 1977 New York City Blackout, U.S. Department of Energy, Washington, DC (1978).
Skof, L. V., Ontario Hydro Surveys on Power System Reliability Summary of Customer Viewpoints, Ontario Hydro Rep. R&MR 80–12, EPRI Seminar (1983).
Wacker, G., Wojczynski, E., Billinton, R., ‘Interruption costs methodology and results—a Canadian residential survey’, IEEE Trans. Power App. Syst., 102 (1983), pp. 3385–91.
Wojczynski, E., Billinton, R., Wacker, G., ‘Interruption cost methodology and results—a Canadian commercial and small industrial survey’, IEEE Trans. Power App. Syst., 103 (1984), pp. 437–43.
Wacker, G., Billinton, R., ‘Farm losses resulting from electric service interruptions—a Canadian survey’, IEEE Trans. Power Syst., 4(2) (1989), pp. 472–78.
IEEE Committee, ‘Report on reliability survey of industrial plants. Part II. Cost of power outage, plant restart time, critical service loss, duration, time and type of loads lost versus time of power outages’, IEEE Trans. Industry Appl., IA-10, (1976), pp. 236–41.
Billinton, R., Wacker, G., Wojczynski, E., Customer Damage Resulting from Electric Service Interruptions, Canadian Electrical Association, R&D Project 907 U 131 Rep. (1982).
Wacker, G., Billinton, R., Brewer, R., Farm Losses Resulting from Electric Service Interruptions, Canadian Electric Association R&D Research Project 3409 U 403, May (1987).
Subramaniam, R. K., Billinton, R., Wacker, G., ‘Factors affecting the development of an industrial customer damage function’, IEEE Trans. Power App. Syst., 104 (1985), pp. 3209–15.
Billinton, R., Wacker, G., Subramaniam, R. K., ‘Factors affecting the development of a commercial customer damage function’, IEEE Trans. Power Syst., 1 (1986), pp. 28–33.
Billinton, R., Wacker, G., Subramaniam, R. K., ‘Factors affecting the development of a residential customer damage function’, IEEE Trans. Power Syst., 2 (1987), pp. 204–9.
Billinton, R., Oteng-Adjei, J., Ghajar, R., ‘Comparison of two alternate methods to establish an interrupted energy assessment rate’, IEEE Trans Power Systems, 2 (1987), pp. 751–7.
Billinton, R., Composite System Adequacy Assessment—the Contingency Enumeration Approach. IEEE Tutorial Text, Reliability assessment of composite generation and transmission systems No. 90, EH0311–1-PWR (1990).
Goel, L., Billinton, R., Gupta, R., Basic Data and Evaluation of Distribution System Reliability Worth, Proc. IEEE Wescanex 91 Conference, Regina, Canada (1991).
Kariuki, K. K., Allan, R. N., Reliability Worth in Distribution Plant Replacement Programmes, 2nd IEE Conference on Reliability of Transmission and Distribution Equipment, Coventry (1995), IEE Conf. Publ. 406, pp. 162–7.
Kariuki, K. K., Allan, R. N., Palin, A., Hartwight, B., Caley, J., Assessment of Customer Outage Costs due to Electricity Service Interruptions, CIRED, Brussels (1995), Vol. 1/2, pp. 2.05.1–2.05.6.
Billinton, R., Li, W., Reliability Assessment of Electric Power Systems Using Monte Carlo Methods, Plenum Press, New York (1994).
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1996 Springer Science+Business Media New York
About this chapter
Cite this chapter
Billinton, R., Allan, R.N. (1996). Evaluation of reliability worth. In: Reliability Evaluation of Power Systems. Springer, Boston, MA. https://doi.org/10.1007/978-1-4899-1860-4_13
Download citation
DOI: https://doi.org/10.1007/978-1-4899-1860-4_13
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4899-1862-8
Online ISBN: 978-1-4899-1860-4
eBook Packages: Springer Book Archive