Advertisement

Budgetary Control Based on Activities Cost, Total Quality and ISO 9000 Norms

  • Francisco Martín Ruiz
Part of the Applied Optimization book series (APOP, volume 19)

Abstract

The traditional budget, aimed at control, presents certain deficiencies that we try to overcome by introducing activity-based management (ABM) and activity-based costing (ABC) systems, which allow us to formulate the activities mix and their importance in relation to the strategies formulated by the firm.These systems will allow an efficient allocation of financial resources and will be the foundation for realistic budgeting. Further, if in the budgetary control based on ABM and ABC we apply as a guide the International ISO 9000 Norms in the procedures for correcting measures in the firm’s quality manual, the development and explotation of the Total Quality system will be facilitated.

Keywords

Total Quality Management Activity-Based Management Activity-Based Costing ISO 9000 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Alonso, V. and Blanco, A. (1990), Dirigir con Calidad Total, Esic Madrid.Google Scholar
  2. Asociacion Española de Contabilidad y Administracion de Empresas (1992), “El proceso presupuestario en la empresa”, Principios de contabilidad de Gestión n° 4, Madrid.Google Scholar
  3. Appleby, R.C. (1971), Así se dirige una empresa, Salamanca.Google Scholar
  4. Barra, R. (1985), Círculos de Calidad en Operaciones, McGraw-Hill, México.Google Scholar
  5. Beaujon, G.J. and Singhal, V.R. (1990), “Understanding the activy of cost in an activity-based cost system”, Journal of Cost Management for the Manufacturing Industry, Spring.Google Scholar
  6. Brausch, J.M. (1992), “Selling ABC. New cost systems can flounder in they’re not marketed”, Management Accountyng, February, National Association of Accountants, Montvale, N.J.Google Scholar
  7. Cataldo Pizarro, J. (1996), Gestión del Presupuesto ABC. Su integración con la Calidad Total y las normas ISO 9000, Marcombo, Barcelona.Google Scholar
  8. Castelló Taliani, E. and Lizcano Alvarez, J. (1994), El sistema de gestión y de costes basado en las actividades, Instituto de Estudios Económicos, Madrid.Google Scholar
  9. Centro Español de Gestión (1983), Cómo organizar la información y el control de una empresa y aumentar su beneficio, Ibérico Europeo de Ediciones, Madrid.Google Scholar
  10. Cooper, R. (1990), “Cost classification in unit-based and activity-based manufactoring cost system”, Journal of Cost Management for the Manufacturing Industry, Summer.Google Scholar
  11. Crosby, P.B. (1993), Hablemos de calidad, McGraw-Hill, México.Google Scholar
  12. Dupuy, Y. and Rolland, G. (1992), Manual de Control de Gestión, Díaz de Santos, Madrid.Google Scholar
  13. Ernest & Young Consultores. Grupo Endesa (1997), “Innovación en la gestión empresarial. Capítulo 3. Gestión de Calidad”. Cuadernos Cinco Días.Google Scholar
  14. Feigenbaum, A.V. (1992), Control Total de la Calidad, Compañía Editorial Continental S.A., México.Google Scholar
  15. Fernandez Fernandez, M.A. (1996), El control Fundamento de la Gestión por Procesos y la Calidad Total, Esic, Madrid.Google Scholar
  16. Johnson, H.T. (1992), “It’s time to stop overselling activity based concepts”, Management Accounting, septiembre.Google Scholar
  17. Juran, J.M. (1990), Juran y el liderazgo de la calidad: un manuel para los directivos, Díaz de Santos S.A., Madrid.Google Scholar
  18. Kaplan, R.S. (1993), “En defensa de la gestión basada en el costo por actividades”, Costos y Gestión, Revista del Instituto Argentino de Profesores Universitarios de Costos, n° 9, Buenos Aires.Google Scholar
  19. Katzan, J.M. (1986), Principios de Productividad, Círculos de Calidad y Robótica, Deusto, Bilbao.Google Scholar
  20. Koehler, R.W. (1991), “Triple-threat strategy. Firms need direct costing and contribution approaches as well as ABC”, Managemente Accounting, October, National Association of Accountants, Montvale, N.J.Google Scholar
  21. Koontz, H. and Weihrich, H. (1994), Administracion. Una perspectiva global, McGraw Hill, México.Google Scholar
  22. Lewis, R.J. (1991), “Activity-based costing for marketing. Physical distribution is the most effective area for this application”, Management Accounting, November, National Assocation of Accountants, Montvale, N.J.Google Scholar
  23. Lòpez de la Viña, M. (1996), Requisitos de un sistema de la calidad según las Normas ISO 9000, Instituto Valenciano de Certificación, Díaz de Santos, Madrid.Google Scholar
  24. Lorino, P. (1992), Le controle de gestion stratégique. La gestion par les activités, Dunod, Paris.Google Scholar
  25. Mallo, C. and Merlo, J. (1995), Control de gestión y control presupuestario, McGraw-Hill, Madrid.Google Scholar
  26. Martin Ruiz, F. (1990), El control de gestión, Tomo I, Granada.Google Scholar
  27. Norese, A.E. (1994), Costos y Gestión, Revista del Instituto Argentino de Profesores Universitarios de Costos, n° 7, Buenos Aires.Google Scholar
  28. Pisón Fernandez, I. (1983), El control de gestión en las pequeñas y medianas empresas, Universidad de Santiago de Compostela.Google Scholar
  29. Rosanas, J.M. (1994), Costes relevantes para la toma de decisiones y análisis estratégico. La contabilidad de Gestión Actual: Nuevos desarrollos, AECA, Madrid.Google Scholar
  30. Roth, H.P. and Borthick, A.F. (1991), “Are you distorting costs by violating ABC assumptions?. Homogeneityand proportionality are key factors in cost data decisions”, Management Accounting, November, National Association of Accountants, Montvale, N.J.Google Scholar
  31. Roth, H.P. and Sims, L.T. (1991), “Costing for warehousing and distribution. Using ABC in a warehouse can affect the bottom line”, Management Accounting, August, National Association of Accountants, Montvale, N.J.Google Scholar
  32. Sharman, P.A. (1993), “Costeo basado en la actividad (ABC). Una práctica creciente”, Costos y Gestión, Revista del Instituto Argentino de Profesores Universitarios de Costos, n° 10, Buenos Aires.Google Scholar
  33. Sharp, D. and Christensen, L.F. (1991), “A new view of activity-based costing. What costs would be eliminated if a product weren’t made?”, Management Accounting, September, National Association of Accountants, Montvale, N.J.Google Scholar
  34. Table, Q.G. (1984), “Control de gestion: una herramienta para la dirección. ¿Cómo lograr que el sistema de control introduzca a la acción comprometida y a fortalecer la estrategia?”, Costos y Gestión, Revista del Instituto Argentino de Profesores Universitarios de Costos, n° 12, Buenos Aires.Google Scholar
  35. Thomas, J. (1993), “Es tiempo de detener la sobrevenía de los conceptos del “Análisis por Actividades” (Activity Based)”, Costos y Gestión, Revista del Instituto Argentino de Profesores Universitarios de Costos, n° 8, Buenos Aires.Google Scholar
  36. Turney, P.B.B. (1992), “ActiviBased Costing. ABM puts ABC information to work”, Management Accounting, January, National Association of Accountants, Montvale, N.J.Google Scholar
  37. Turney, P.B.B. (1993), “Gestión Basada en Actividades (ABM)”, Costos y Gestión, Revista del Instituto Argentino de Profesores Universitarios de Costos, n° 7, Buenos Aires.Google Scholar
  38. Welsch, G. A., Hilton, R.W. and Gordon, P.N. (1990), Presupuestos. Planificación y control integrado de gestión, De. Prentice Hall Hispanoamericana, S.A. México.Google Scholar

Copyright information

© Springer Science+Business Media Dordrecht 1998

Authors and Affiliations

  • Francisco Martín Ruiz
    • 1
  1. 1.Dept. of Business AdministrationUniversity of MalagaSpain

Personalised recommendations