Abstract
“Procuring” for this discussion means getting what is needed. For machinery such as centrifugal pumps, this usually involves four steps:
-
1.
Deciding on the purchasing arrangement
-
2.
Preparing the specification and bid request
-
3.
Evaluating the bids and selecting the equipment
-
4.
Placing the order and verifying its progress.
In the following sections, each of these steps is addressed with the emphasis on what is necessary for the successful procurement of centrifugal pumps.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1998 Chapman & Hall
About this chapter
Cite this chapter
Karassik, I.J., McGuire, T. (1998). Procuring Centrifugal Pumps. In: Centrifugal Pumps. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-6604-5_27
Download citation
DOI: https://doi.org/10.1007/978-1-4615-6604-5_27
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4615-6606-9
Online ISBN: 978-1-4615-6604-5
eBook Packages: Springer Book Archive