Skip to main content

Collider Dipole Magnet Test Program From Development Through Production

  • Chapter
Supercollider 3
  • 22 Accesses

Abstract

Verification of CDM performance, reliability, and magnet production processes will be accomplished during the development phase of the program. Key features of this program include thorough in process testing of magnet subassemblies, verification of the magnetic field quality, and demonstration of the CDM performance during the formal qualification program. Reliability demonstration of the CDM design includes component tests and an accelerated life test program. The Prototype magnet phase will address achievement of magnet performance goals through a program of fabrication, test, analysis, redesign as required and procurement of modified parts for a second fabrication run. This process would be repeated again if necessary, and would conclude with a final design for the production magnets. Production process validation will address the effects that key production processes have upon magnet performance, using the magnets produced during the Preproduction phase.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. G. W. Albert, A. H. Kytasty and R. E. Bailey: General Dynamics Space Systems Division, “SSC Dipole Magnet Accelerated Life Test Program,”.

    Google Scholar 

  2. A. Kytasty: General Dynamics Space Systems Division, “CDM Reliability: Essential to Achieving An Operable Superconducting SUPER COLLIDER”.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1991 Springer Science+Business Media New York

About this chapter

Cite this chapter

Bailey, R.E. (1991). Collider Dipole Magnet Test Program From Development Through Production. In: Nonte, J. (eds) Supercollider 3. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-3746-5_107

Download citation

  • DOI: https://doi.org/10.1007/978-1-4615-3746-5_107

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-1-4613-6668-3

  • Online ISBN: 978-1-4615-3746-5

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics