The scheduling of the construction activities for the SSC Project involves two major concurrent emphases on design, construction, installation, and test. These two major activities include the completion of the construction project by the end of FY98 (108 months construction time) and industrially produced magnet tests by the end of FY92 (30–1/2 months from this point in time). Scheduling of the construction activities is further complicated by the fact that the baseline cost and schedule is still under review and negotiation with the Department of Energy and the currently anticipated funding for FY91 is somewhat less than originally requested. However, with the above limitations, the schedules presented herein are the most current at this time.
Operated by Universities Research Association, Inc., for the U.S. Department of Energy under Contract No. DE-ACO2-89ER40486.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1990 Springer Science+Business Media New York
About this chapter
Cite this chapter
Kozman, T. (1990). Scheduling the SSC Construction. In: McAshan, M. (eds) Supercollider 2. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-3728-1_15
Download citation
DOI: https://doi.org/10.1007/978-1-4615-3728-1_15
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4613-6659-1
Online ISBN: 978-1-4615-3728-1
eBook Packages: Springer Book Archive