Abstract
This is a topic that is far wider and more demanding than might first appear, and one which involves more than one clause of the standard. The prime requirement of clause 4.9 is to plan the production, installation and servicing and to carry them out under controlled conditions, including adequate procedures to manage the situation when things go wrong, and to provide for adequate distribution of the products.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1997 Andrew Bolton
About this chapter
Cite this chapter
Bolton, A. (1997). Process control. In: Quality Management Systems for the Food Industry. Springer, Boston, MA. https://doi.org/10.1007/978-1-4615-2189-1_8
Download citation
DOI: https://doi.org/10.1007/978-1-4615-2189-1_8
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4613-5917-3
Online ISBN: 978-1-4615-2189-1
eBook Packages: Springer Book Archive