Recordkeeping

  • Andrew M. Welt

Abstract

Are all processing and production data, including but not limited to (i) product; (ii) the code number; (iii) the date; (iv) the retort or processing system number; (v) the size of the container; (vi) the approximate number of containers per coding interval; (vii) the initial temperature and the actual processing time; (viii) the mercury-ink and thermometer readings; (ix) the recorded thermometer readings; and (x) other critical factors specified in the scheduled process?

Keywords

Mercury Steam Shipping Assure Sewage 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Science+Business Media Dordrecht 1995

Authors and Affiliations

  • Andrew M. Welt
    • 1
  1. 1.Alpha Omega, IncUSA

Personalised recommendations