Climate change adds a new source of unknowns for the electricity sector. Despite considerable risks and opportunities, energy sector actions to manage climate change risks and take advantage of future opportunities remain limited and patchy. An estimate of the sums spent since 2000 and planned out to the 2020s by five utilities on climate risk management totals US$1.5 billion. Considering that these investments are to address climate change risks or opportunities of a considerable magnitude, they are relatively modest. The sector has focused on climate data analysis and research on impacts rather than on concrete capital, technological and/or behavioral adaptation responses. Further, most of this research is concentrated for the most part in the developed world and on a handful of climate change impacts. Analysis of early adapters in the electricity sector offers a number of useful lessons for power utilities, regulators and stakeholders in the developing world, for instance: (i) joint efforts between the electricity sector and hydrometeorological offices to develop high quality and tailored climate data and information are needed to avoid ‘wait-and-see’ strategies among power utilities; (ii) energy sector adaptation requires going beyond high level research on impacts and adaptation to produce information that can be applied operationally; (iii) without a business environment favorable to climate change adaptation, power utilities have little incentive to go beyond ‘business-as-usual’ weather risk management; and (iv) it is by building the economic case for adaptation that utilities can be incentivized to take action.

Keywords

Climate Change Impact Flood Risk Climate Change Adaptation Environmental Impact Assessment Climate Risk 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

References

  1. AECOM/Purdon Associates (2009) East lake electrical infrastructure: draft environmental impact statement, vol 1. Canberra, AustraliaGoogle Scholar
  2. Brewster M, Ling FLN, Connarty M (2009) Climate change response from a renewable electricity business. Int J HydroPower Dams 16:59–62Google Scholar
  3. Carroll AL, Taylor SW, Regniere J, Safranyik L (2003) Effects of climate change on range expansion by the mountain pine beetle in British Columbia. In: Shore TL, Brooks JE, Stone JE (eds) Proceedings of mountain pine beetle symposium: challenges and solutions, pp 223–232. Information Report BC-X-399, Natural Resources Canada, Victoria, 2003Google Scholar
  4. CLP (2011) CLP adaptation strategyGoogle Scholar
  5. CLP’s Climate Vision 2050: Our Manifesto on Climate Change (2007)Google Scholar
  6. Comité Provincial d’Examen (COMEX) (2006) Project hydroélectrique Eastmain-1A et derivation Rupert. Rapport du comité provincial d’examen à l’administrateur du chapitre 22 de la Convention de la Baie-James et du Nord québécois. Ministère du développement durable, environnement et parcs, QuébecGoogle Scholar
  7. Darlington New Nuclear Power Plant Project (2011) See recommendation 39 in joint review panel environmental assessment report. ISBN: 978-1-100-19116-4Google Scholar
  8. Dubus L (2009) Impacts of weather, climate and climate change on the electricity sector. Energy Week 2009, The World Bank GroupGoogle Scholar
  9. Ebinger J, Vergara W (2011) Climate impacts on energy systems: key issues for energy sector adaptation. World Bank, Washington, DC;European Observation Network, Territorial Development and Cohesion (ESPON) (2010) Discussion paper: impacts of climate change on regional energy systemsGoogle Scholar
  10. Ebinger et al (2011), ibid; and World Bank. 2010. Africa’s development in a changing climate. Key policy advice from the World Development Report (2010) World Bank. Washington, DCGoogle Scholar
  11. Electric Power Research Institute (EPRI), North American Electric Reliability Corporation (NERC) and Power System Engineering Research Center (PSERC) (2008) Proceedings of the joint technical summit on reliability impacts of extreme weather and climate change. EPRI, Palo Alto, CA, NERC, Princeton, NJ, and PSERC, Tempe, AZ: 2008. 1016095Google Scholar
  12. Eskom (2009) ibidGoogle Scholar
  13. Grynbaum MM (2011) Power substations in lower Manhattan are vulnerable to flooding. New York Times. 27 Aug 2011; and National Grid Electricity Transmission plc. 2010. Climate Change Adaptation Report; and Williamson, et al., 2010, ibid.Google Scholar
  14. Institut de la Statistique de Québec (2009) Résultats de l’enquête sur la remuneration globale au Québec., CollecteGoogle Scholar
  15. International Energy Agency (IEA) (2011) Climate and electricity annual 2011. IEA, Paris, p 90. ISBN: 978-92-64-11154-7Google Scholar
  16. International Institute for Applied Systems Analysis (IIASA) (2010) Natural catastrophes and developing countries. IIASA, ViennaGoogle Scholar
  17. Janos T, Gurney JH (2008) Impacts of climate change on the planning, operation and asset management of high voltage transmission system. Presentation to the CIGRE Canada (Canadian national committee of the international council on large electric systems) 2008 conference on power systems, Winnipeg, 19–21 Oct 2008Google Scholar
  18. Jenkins GJ, Perry MC, Prior MJ (2007) The climate of the United Kingdom and recent trends. Met Office Hadley Centre, Exeter, UKGoogle Scholar
  19. Knutson T, McBride JL, Chan J, Emanuel K, Holland G, Landsea C, Held I, Kossin JP, Srivastava AK, Sugi M (2010) Tropical cyclones and climate change. Nat Geosci 3:157–163CrossRefGoogle Scholar
  20. Lennon S (2010) Advances in dry cooling deployed at South Africa power stations. Presentation at the electric power research institute 2011 summer seminar, 1 Aug 2011Google Scholar
  21. Lennon S (2011) Advances in dry cooling deployed at South Africa power stations. 2011 Electric Power Research Institute (EPRI) Summer Seminar, 1–2 Aug 2011Google Scholar
  22. Létard V, Flandre H, Lepeltier S (2004) La France et les Français face à la canicule: les leçons d’une crise. Report No. 195 (2003–2004) to the Sénat, Government of France, pp 391Google Scholar
  23. Linnenluecke, Stathakis, Griffiths (2011) Firm relocation as adaptive response to climate change and weather extremes. Glob Environ Change 21(1):123–133Google Scholar
  24. MacKinsey (2009) Promoting Energy Efficiency in the Developing World. McKinsey Quarterly, February, New YorkGoogle Scholar
  25. Mechler R, Hochrainer S, Pflug G, Williges K, Lotsch A (2009) Assessing financial vulnerability to climate-related natural hazards. Background paper for the WDR 2010Google Scholar
  26. Minville M, Brissette F, Krau F, Leconte R (2009) Adaptation to climate change in the management of a Canadian water-resources system exploited for hydropowerGoogle Scholar
  27. Mirza M (2011) Climate change and the Canadian energy sector: A background paperGoogle Scholar
  28. Musilek P, Arnold D, Lozowski EP (2009) An ice accretion forecasting system (IAFS) for power transmission lines using numerical weather prediction. SOLA 5:25–28CrossRefGoogle Scholar
  29. Nadeau Y (2008) Climate change and normals: planning issue initiative of Hydro-québec distribution. Presentation at the joint technical summit on reliability impacts of extreme weather and climate change. Electric Power Research Institute, North American Electric Reliability Corporation and Power System Engineering Research Center, Portland, 15 Oct 2008Google Scholar
  30. National Grid Electricity Transmission plc. (2010) Climate change adaptation reportGoogle Scholar
  31. Ontario Government (2011) Climate ready: Ontario’s Adaptation Strategy and Action PlanGoogle Scholar
  32. Pather V (2004) Eskom and water. Proceedings of the 2004 water institute of Southern Africa Biennial conference, Cape Town, South Africa, 2–6 May 2004Google Scholar
  33. Pytlak P, Musilek P, Lozowski E, Toth J (2011) Modelling precipitation cooling of overhead conductors. Electric Power Syst Res 81(12):2147–2154CrossRefGoogle Scholar
  34. Roy R, Pacher G, Roy L, Silver R (2008) Adaptive management for climate change in water resources planning and operation. Hydro Québec-IREQ, p 75Google Scholar
  35. Silver R, Roy R (2010) Hydro-Québec’s experience in adapting to climate change. Presentation for the international association for impact assessment special symposium on climate change and impact assessment, Washington, DC, 15–16 Nov 2010Google Scholar
  36. Toth J (2011) Risk/challenges for generation.Transmission and distribution infrastructure relative to climate change. BC Hydro, Vancouver, BCGoogle Scholar
  37. Troccoli A (ed) (2009) Management of weather and climate risk in the energy industry. Proceedings of the NATO advanced research workshop on weather/climate risk management for the energy sector Santa Maria di Leuca, Springer, Italy, 6–10 Oct 2008Google Scholar
  38. Turcotte C (2008) L’après-crise aura couté 2 milliards. Le Devoir. Available at http://www.ledevoir.com/environnement/actualites-sur-l-environnement/170771/l-apres-crise-aura-coute-deux-milliards. Accessed 25 Oct 2011
  39. U.S. Department of Energy (2010) Hardening and Resiliency. U.S. Energy Industry Response to Recent Hurricane Seasons. U.S. Department of Energy, Washington, DCGoogle Scholar
  40. Urban F, Mitchell T (2011) Climate change, disasters and electricity generation. Strengthening climate resilience discussion paper no 8, Institute of Development Studies, BrightonGoogle Scholar
  41. Veit S (2009) Climate risk management for the energy sector in Africa: the role of the African Development Bank. In: Troccoli (ed.), 2009Google Scholar
  42. Watson SJ (2006) Report on EPSRC project GR/18915/01: a generic process for assessing climate change impacts on the electricity supply industry and utilities (GENESIS)Google Scholar
  43. Wilbanks TJ, Romero Lankao P, Bao M, Berkhout F, Cairncross S, Ceron J-P, Kapshe M, Muir-Wood R, Zapata-Marti R (2007) Industry, settlement and society. Climate change 2007: Impacts, adaptation and vulnerability. Contribution of working group II to the fourth assessment report of the intergovernmental panel on climate change, Parry ML, Canziani OF, Palutikof JP, van der Linden PJ, Hanson CE (eds), Cambridge University Press, Cambridge, pp 357–390Google Scholar
  44. Williamson LE, Connor H, Moezzi M (2009) Climate proofing energy systems. Helio InternationalGoogle Scholar
  45. World Bank (2010) The costs to developing countries of adapting to climate change. New methods and estimates. The global report of the economics of adaptation to climate change study, consultation draft. The World Bank, Washington, DCGoogle Scholar

Copyright information

© Springer Science+Business Media New York 2014

Authors and Affiliations

  • Pierre Audinet
    • 1
  • Jean-Christophe Amado
    • 2
  • Ben Rabb
    • 3
  1. 1.ESMAP–World Bank GroupWashingtonUSA
  2. 2.Deloitte (formerly Acclimatise)OttawaCanada
  3. 3.AcclimatisePascoe HouseCardiff BayUK

Personalised recommendations