From Operational to Financial Evaluation of Manufacturing Systems

  • Nico J. Vandaele
Chapter
Part of the International Series in Operations Research & Management Science book series (ISOR, volume 192)

Abstract

Modeling of manufacturing systems is a well-established field with growing importance and an increasing body of knowledge. With this maturity, the interdisciplinary motivation rises where the technical aspects of the analysis of manufacturing systems have to be embedded in the economic reality of decision making of an organization. We do not only want to evaluate the operational performance of a manufacturing system, but also want to integrate the financial aspects in the modeling itself, so that operational decisions for the best development and/or the best improvements are simultaneously supported by sound financial considerations. In this chapter we go beyond the traditional cost models and we set a first step towards this challenge with the study of lot sizing and overtime within the field of stochastic models of manufacturing systems.

Keywords

Lead Time Setup Time Batch Size Setup Cost Short Lead Time 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

References

  1. 1.
    Altendorfer, K., & Jodlbauer, H. (2011). Which utilization and service level lead to the maximum eva? International Journal of Production Economics, 130, 16–26.CrossRefGoogle Scholar
  2. 2.
    Badell, M., Romero, J., Huertas, R., & Puigjaner, L. (2004). Planning, scheduling and budgeting value-added chains. Computers and Chemical Engineering, 28, 45–61.CrossRefGoogle Scholar
  3. 3.
    Bertrand, J. (1985). Multiproduct optimal batch sizes with in-process inventories and multi work centers. IIE Transactions, 17(2), 157–163.CrossRefGoogle Scholar
  4. 4.
    Brewer, P., Chandra, G., & Hock, C. (1999). Economic value added (eva): Its uses and limitations. SAM Advanced Management Journal, 64(2), 4–11.Google Scholar
  5. 5.
    Choi, S., & Enns, S. (2004). Multi-product capacity-constrained lot sizing with economic objectives. International Journal of Production Economics, 91, 47–62.CrossRefGoogle Scholar
  6. 6.
    Comelli, M., Fénies, P., & Tchernev, N. (2008). A combined financial and physical flows evaluation for logistic process and tactical production planning: Application in a company supply chain. International Journal of Production Economics, 112, 77–95.CrossRefGoogle Scholar
  7. 7.
    Corbey, M., & Jansen, R. (1993). The economic lot size and relevant costs. International Journal of Production economics, 30, 519–530.CrossRefGoogle Scholar
  8. 8.
    Ghalayini, A., & Noble, J. (1996). The changing basis of performance measurement. International Journal of Operations & Production Management, 16(8), 63–80.CrossRefGoogle Scholar
  9. 9.
    Glässer, D., Rabta, B., Reiner, G., & Alp, A. (2010). Evaluation of the dynamic impacts of lead time reduction on finance based on open queueing networks. In Rapid modelling and quick response (pp. 145–161). London: Springer.Google Scholar
  10. 10.
    Govil, M., & Fu, M. (1999). Queueing theory in manufacturing: A survey. Journal of Manufacturing systems, 18(3), 214–240.CrossRefGoogle Scholar
  11. 11.
    Grubbström, R. (1980). A principle for determining the correct capital costs of work-in- progress and inventory. International Journal of Production Research, 18(2), 259–271.CrossRefGoogle Scholar
  12. 12.
    Grubbström, R., & Wang, Z. (2003). A stochastic model of multi-level/multi-stage capacity- constrained production-inventory systems. International Journal of Production Economics, 81, 483–494.CrossRefGoogle Scholar
  13. 13.
    Guillén, G., Badell, M., Espuña, A., & Puigjaner, L. (2006). Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains. Computers and Chemical Engineering, 30, 421–436.CrossRefGoogle Scholar
  14. 14.
    Guillén, G., Badell, M., & Puigjaner, L. (2007). A holistic framework for short-term supply chain management integrating production and corporate financial planning. International Journal of Production Economics, 106, 288–306.CrossRefGoogle Scholar
  15. 15.
    Gunasekaran, A., Patel, C., & Tirtiroglu, E. (2001). Performance measures and metrics in a supply chain environment. International Journal of Operations & Production Management, 21(1), 71–87.CrossRefGoogle Scholar
  16. 16.
    Hahn, G., & Kuhn, H. (2010). Optimizing a value-based performance indicator in mid-term sales and operations planning. Journal of the Operational Research Society, 62(3), 515–525.CrossRefGoogle Scholar
  17. 17.
    Hopp, W., & Spearman, M. (1996). Factory physics, foundations of manufacturing management. Irwin: The McGraw-Hill Companies.Google Scholar
  18. 18.
    Hopp, W., Spearman, M., Chayet, S., Donohue, K., & Gel, E. (2002). Using an optimized queueing network model to support wafer fab design. IIE Transactions, 34, 119–130.Google Scholar
  19. 19.
    Karmarkar, U. (1987). Lot sizes, lead times and in-process inventories. Management Science, 33, 409–423.CrossRefGoogle Scholar
  20. 20.
    Karmarkar, U., Kekre, S., & Kekre, S. (1985). Lot sizing in multi-item multi-machine job shops. IIE Transactions, 17(3), 290–292.CrossRefGoogle Scholar
  21. 21.
    Kenyon, G. (1997). A profit-based lot-sizing model for the n-job, m-machine job shop: Incorporating quality, capacity, and cycle time. PhD thesis, Graduate Faculty of Texas Tech University, Department for Business Administration.Google Scholar
  22. 22.
    Kenyon, G., Canel, C., & Neureuther, B. (2005). The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing. International Journal of Production Economics, 97, 263–278.CrossRefGoogle Scholar
  23. 23.
    Kuik, R., & Tielemans, P. (1998). Analysis of expected queueing delays for decision making in production planning. European Journal of Operational Research, 110, 658–681.CrossRefGoogle Scholar
  24. 24.
    Kuik, R., & Tielemans, P. (2004). Expected time in system analysis of a single-machine multi-item processing center. European Journal of Operational Research, 156, 287–304.CrossRefGoogle Scholar
  25. 25.
    Lambrecht, M., & Vandaele, N. (1996). A general approximation for the single product lot sizing model with queueing delays. European Journal of Operational Research, 95, 73–88.CrossRefGoogle Scholar
  26. 26.
    Lambrecht, M., Ivens, P., & Vandaele, N. (1998). ACLIPS: A capacity and lead time integrated procedure for scheduling. Management Science, 44(11), 1548–1561.CrossRefGoogle Scholar
  27. 27.
    Maskell, B., & Kennedy, F. (2007). Why do we need lean accounting and how does it work? Journal of Corporate Accounting & Finance, 18(3), 59–73.CrossRefGoogle Scholar
  28. 28.
    van der Merwe, A. (2008). Debating the principles: Asking questions of lean accounting. Cost Accounting, 22(5), 29–36.Google Scholar
  29. 29.
    Missbauer, H. (2002). Lot sizing in workload control systems. Production Planning & Control, 13(7), 649–664.CrossRefGoogle Scholar
  30. 30.
    Neely, A., Mills, J., Platts, K., Richards, H., Bourne, M., & Kennerley, M. (2000). Performance measurement system design: Developing and testing a process-based approach. International Journal of Operations and Production Management, 20(10), 1119–1145.CrossRefGoogle Scholar
  31. 31.
    Ray, S., & Jewkes, E. (2004). Customer lead time management when both demand and price are lead time sensitive. European Journal of Operations Research, 153(3), 769–781.CrossRefGoogle Scholar
  32. 32.
    Suri, R. (1998). Quick response manufacturing: A companywide approach to reducing lead times. Portland: Productivity Press, a division of Productivity Inc.Google Scholar
  33. 33.
    Vandaele, N., Vannieuwenhuyse, I., & Cupers, S. (2003). Optimal grouping for a nuclear magnetic resonance scanner by means of an open queueing model. European Journal of Operational Research, 151(1), 181–192.CrossRefGoogle Scholar
  34. 34.
    Whitt, W. (1983). The queueing network analyzer. The Bell System Technical Journal, 62(9), 2779–2815.Google Scholar
  35. 35.
    Wouters, M. (1991). Economic evaluation of leadtime reduction. International Journal of Production Economics, 22, 111–120.CrossRefGoogle Scholar
  36. 36.
    Yi, G., & Reklaitis, G. (2004). Optimal design of batch-storage network with financial transactions and cash flows. AIChE Journal, 50(11), 2849–2865.CrossRefGoogle Scholar
  37. 37.
    Young, S., & O’Byrne, S. (2001). EVA and value-based management. A practical guide to implementation. New York: McGraw-HillGoogle Scholar
  38. 38.
    Zipkin, P. (1986). Models for design and control of stochastic, multi-item batch production systems. Operations Research, 34(1), 91–104.CrossRefGoogle Scholar

Copyright information

© Springer Science+Business Media New York 2013

Authors and Affiliations

  1. 1.Faculty of Business and EconomicsKatholieke Universiteit LeuvenLeuvenBelgium

Personalised recommendations