Skip to main content

Manufacturing and Re-manufacturing Systems

  • Chapter
  • First Online:
  • 5879 Accesses

Part of the book series: International Series in Operations Research & Management Science ((ISOR,volume 189))

Abstract

In this chapter, we consider the application of the Markovian queueing systems discussed in Chap. 2 in modeling manufacturing systems and re-manufacturing systems. We adopt Hedging Point Production (HPP) policy as a production control policy. We note that in a queueing system, there are servers, customers, and waiting spaces. To model a make-to-order manufacturing system by a queueing system, one may regard a server as a machine. The customers can be regarded as the inventory of product or the jobs to be processed respectively; see for instance Buzacott and Shanthikumar [34]. In a manufacturing system, a certain amount of inventory (called the hedging point) is kept to cope with the fluctuation of demand and therefore production control is necessary. The system will stop production when this level of inventory is attained.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   99.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   129.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   129.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Ammar G, Gragg W (1988) Superfast solution of real positive definite Toeplitz systems. SIAM J Matrix Anal Appl 9:61–76

    Article  Google Scholar 

  2. Axsäter S (1990) Modelling emergency lateral transshipments in inventory systems. Manag Sci 36:1329–1338

    Article  Google Scholar 

  3. Blumberg D (2005) Introduction to management of reverse logistics and closed loop supply chain processes. CRC, Boca Raton

    Google Scholar 

  4. Bunch J (1985) Stability of methods for solving Toeplitz systems of equations. SIAM J Scient Stat Comput 6:349–364

    Article  Google Scholar 

  5. Buzacott J, Shanthikumar J (1993) Stochastic models of manufacturing systems. Prentice-Hall International Editions, New Jersey

    Google Scholar 

  6. Chan R, Ching W (1996) Toeplitz-circulant preconditioners for Toeplitz systems and their applications to queueing networks with batch arrivals. SIAM J Scientif Comput 17:762–772

    Article  Google Scholar 

  7. Chan R, Ching W (2000) Circulant preconditioners for stochastic automata networks. Numerise Mathematik 87:35–57

    Article  Google Scholar 

  8. Ching W (1997) Circulant preconditioners for failure prone manufacturing systems. Linear Algebra Appl 266:161–180

    Article  Google Scholar 

  9. Ching W (1997) Markov modulated poisson processes for multi-location inventory problems. Int J Product Econ 53:217–223

    Article  Google Scholar 

  10. Ching W (1998) Iterative methods for manufacturing systems of two stations in Tandem. Appl Math Lett 11:7–12

    Article  Google Scholar 

  11. Ching W (2000) Circulant preconditioning for unreliable manufacturing systems with batch arrivals. Int J Appl Math 4:11–21

    Google Scholar 

  12. Ching W (2001) Iterative methods for queuing and manufacturing systems. Springer monographs in mathematics. Springer, London

    Google Scholar 

  13. Ching W (2001) Markovian approximation for manufacturing systems of unreliable machines in Tandem. Int J Naval Res Logist 48:65–78

    Article  Google Scholar 

  14. Ching W, Chan R, Zhou X (1997) Circulant preconditioners for Markov modulated poisson processes and their applications to manufacturing systems. SIAM J Matrix Anal Appl 18:464–481

    Article  Google Scholar 

  15. Ching W, Loh A (2003) Iterative methods for flexible manufacturing systems. J Appl Math Comput 141:553–564

    Article  Google Scholar 

  16. Ching W, Ng M, Yuen W (2003) In: Kumar V, Gavrilova M, Tan C, L’Ecuyer P (eds) A direct method for block-toeplitz systems with applications to re-manufacturing systems. Lecture notes in computer science 2667, vol 1. Springer, Berlin, pp 912–920

    Google Scholar 

  17. Ching W, Ng M, Yuen W (2005) A direct method for solving block-toeplitz with near-circulant-block systems with applications to hybrid manufacturing systems. J Numer Linear Algebra Appl 12:957–966

    Article  Google Scholar 

  18. Ching W, Yuen W, Loh A (2003) An inventory model with returns and lateral transshipments. J Oper Res Soc 54:636–641

    Article  Google Scholar 

  19. Cho D, Parlar M (1991) A survey of maintenance models for multi-unit systems. Eur J Oper Res 51:1–23

    Article  Google Scholar 

  20. Dekker R, Fleischmann M, Inderfurth K, van Wassenhove L (2004) Reverse logistics: quantitative models for closed-loop supply chains. Springer, Berlin

    Google Scholar 

  21. Fleischmann M (2001) Quantitative models for reverse logistics. Lecture notes in economics and mathematical systems, vol 501. Springer, Berlin

    Google Scholar 

  22. Golub G, van Loan C (1989) Matrix computations. John Hopkins University Press, Baltimore

    Google Scholar 

  23. Heyman D (1977) Optimal disposal policies for single-item inventory system with returns. Naval Res Logist 24:385–405

    Article  Google Scholar 

  24. Inderfurth K, van der Laan E (2001) Leadtime effects and policy improvement for stochastic inventory control with remanufacturing. Int J Product Econ 71:381–390

    Article  Google Scholar 

  25. Kiesmüller G, van der Laan E (2001) An inventory model with dependent product demands and returns. Int J Product Econ 72:73–87

    Article  Google Scholar 

  26. Klose A, Speranze G, Van Wassenhove LN (2002) Quantitative approaches to distribution logistics and supply chain management. Springer, Berlin

    Book  Google Scholar 

  27. van der Laan E (2003) An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing. Int J Product Econ 81–82:317–331

    Article  Google Scholar 

  28. van der Laan E, Dekker R, Salomon M, Ridder A (2001) An (s,Q) inventory model with re-manufacturing and disposal. Int J Product Econ 46:339–350

    Article  Google Scholar 

  29. van der Laan E, Salomon M (1997) Production planning and inventory control with re-manufacturing and disposal. Eur J Oper Res 102:264–278

    Article  Google Scholar 

  30. Latouche G, Ramaswami V (1999) Introduction to matrix analytic methods in stochastic modeling. SIAM, Pennsylvania

    Book  Google Scholar 

  31. Latouche G, Taylor P (2002) Matrix-analytic methods theory and applications. World Scientific, Singapore

    Google Scholar 

  32. Muckstadt J (2005) Analysis and algorithms for service parts supply chains. Springer, New York

    Google Scholar 

  33. Muckstadt J, Isaac M (1981) An analysis of single item inventory systems with returns. Int J Naval Res Logist 28:237–254

    Article  Google Scholar 

  34. Nahmias S (1981) Managing repairable item inventory systems: a review in TIMS studies. Manag Sci 16:253–277

    Google Scholar 

  35. Richter K (1994) An EOQ repair and waste disposal. In: Proceedings of the eighth international working seminar on production economics. Igls/Innsbruch, Austria, pp 83–91

    Google Scholar 

  36. Robinson L (1990) Optimal and approximate policies in multi-period, multi-location inventory models with transshipments. Oper Res 38:278–295

    Article  Google Scholar 

  37. Teunter R, van der Laan E (2002) On the non-optimality of the average cost approach for inventory models with remanufacturing. Int J Product Econ 79:67–73

    Article  Google Scholar 

  38. Thierry M, Salomon M, van Nunen J, van Wassenhove L (1995) Strategic issues in product recovery management. Calif Manag Rev 37:114–135

    Article  Google Scholar 

  39. Trench W (1964) An algorithm for the inversion of finite Toeplitz matrices. SIAM J Appl Math 12:515–522

    Article  Google Scholar 

  40. Varga R (1963) Matrix iterative analysis. Prentice-Hall, New Jersey

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer Science+Business Media New York

About this chapter

Cite this chapter

Ching, WK., Huang, X., Ng, M.K., Siu, TK. (2013). Manufacturing and Re-manufacturing Systems. In: Markov Chains. International Series in Operations Research & Management Science, vol 189. Springer, Boston, MA. https://doi.org/10.1007/978-1-4614-6312-2_3

Download citation

Publish with us

Policies and ethics