Abstract
Robots are complex and sophisticated machines with good reliability in general. Nevertheless, occasionally these machines do fail and require maintenance just as in the case of other sophisticated engineering systems. Therefore, the users of robots have to devise a sound maintenance program, otherwise their unscheduled downtime may increase beyond limit, consequently defeating the purpose of robot applications. In addition, a poor maintenance program may also lead to safety-related problems.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Maintainability Engineering Theory and Practice, AMC Pamphlet No. AMCP 706-133, prepared by the Department of the Army, Headquarters United States Army Material Command, 5001 Eisenhower Avenue, Alexandria, Virginia 22333, January 1976.
Maintenance Engineering Techniques, AMC Pamphlet No. AMCP 706-132, prepared by the Department of the Army, Headquarters United States Army Material Command, 5001 Eisenhower Avenue, Alexandria, Virginia 22333, June 1975.
MIL-STD-721B, Definitions of Effectiveness Terms for Reliability, Maintainability, Human Factors, and Safety, prepared by the , Washington, DC, August 1966.
W.A. Lester, R.P. Lannon, R. Bellandi, Robot Users Need To Have a Program for Maintenance, Industrial Engineering, January 1985, pp. 28–32.
L.V. Ottinger, Robot System’s Success Based on Maintenance, in Robotics (edited by E.L. Fisher ), Industrial Engineering and Management Press, Institute of Industrial Engineers, Atlanta, Georgia, 1983, pp. 204–208.
G.E. Munson, Industrial Robots: Reliability, Maintenance, and Safety, in Handbook of Industrial Robotics (edited by S.Y. Nof ), Wiley, New York, 1985, pp. 722–758.
W.A. Lester, R.P. Lannon, R. Bellandi, Recommendations for Maintenance of Robots, Industrial Engineering, February 1985, pp. 30–35.
An Interpretation of the Technical Guidance on Safety Standards in the Use, etc., of Industrial Robots, edited by the Japanese Ministry of Labor, Japanese Industrial Safety and Health Association, Tokyo, 1985.
American National Standard for Industrial Robots and Robot Systems—Safety Requirements, Document No. ANSI/RIA R 15.06, 1986, prepared by the Robotic Industries Association, 900 Victors Way, P.O. Box 3724, Ann Arbor, Michigan 48106.
J.E. Lodge, How to Protect Robot Maintenance Workers, National Safety News, June 1984, pp. 48–51.
A. Pages, M. Gondran, System Reliability, Springer-Verlag, New York, 1986.
A.H.S. Ang, W.H. Tang, Probability Concepts in Engineering Planning and Design, Vol. II, Wiley, New York, 1984.
D.E. Rosenheim, Analysis of Reliability Improvement Through Redundancy, Proceedings of the New York University Conference on Reliability Theory, June 1958, pp. 19–142.
W.H. Von Alven, (editor), Reliability Engineering, Prentice-Hall, Englewood Cliffs, New Jersey, 1964.
B.S. Dhillon, Mechanical Reliability: Theory, Models and Applications, American Institute of Aeronautics and Astronautics, Washington, DC, 1988.
P.M. Morse, Queues, Inventories and Maintenance, Wiley, New York, 1958.
B.S. Dhillon, Reliability Engineering in Systems Design and Operation, van Nostrand Reinhold, New York, 1983.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1991 Springer-Verlag New York, Inc
About this chapter
Cite this chapter
Dhillon, B.S. (1991). Robot Maintenance. In: Robot Reliability and Safety. Springer, New York, NY. https://doi.org/10.1007/978-1-4612-3148-6_9
Download citation
DOI: https://doi.org/10.1007/978-1-4612-3148-6_9
Publisher Name: Springer, New York, NY
Print ISBN: 978-1-4612-7814-6
Online ISBN: 978-1-4612-3148-6
eBook Packages: Springer Book Archive