Abstract
In the years after the Bo01 project, new developments were made in the Western Harbor area in Malmö (Fig. 6.1). A large development site was also built in the Hyllie area, south of the city center (Fig. 6.2). Much of the experience gathered in relation to solid waste management from previous development areas came to be used in the development of these two sites.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
City of Malmö (2009) Environmental program for the city of Malmö. http://malmo.se/download/18.76105f1c125780a6228800031254/Milj%C3%B6program+f%C3%B6r+Malm%C3%B6+stad+2009-2020.pdf
City of Malmö (2011) Malmö Stad Trafikmiljöprogram 2012–2017. http://www.malmo.se/Kommun–politik/Om-oss/Forvaltningar–bolag/Gatukontoret/Plan–atgards–och-policyprogram/Trafikmiljo.html
Fossum T (2013) Civil servant at Malmö City Planning office, Interview February 2013
Hoppe M (2012) Waste Management Technology in Everyday Life. VA SYD final project report, January 2012. Applied Cultural Analysis at Lund University
Swedish Waste Management Organization (2008) Vart tar smått el-avfall från hushåll vägen? Report 2008:03. Swedish Waste Management Association, Malmö
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2013 The Author(s)
About this chapter
Cite this chapter
Bernstad Saraiva Schott, A., Aspegren, H., Bissmont, M., la Cour Jansen, J. (2013). New Projects, Building on Previous Experience. In: Modern Solid Waste Management in Practice. SpringerBriefs in Applied Sciences and Technology. Springer, London. https://doi.org/10.1007/978-1-4471-6263-6_6
Download citation
DOI: https://doi.org/10.1007/978-1-4471-6263-6_6
Published:
Publisher Name: Springer, London
Print ISBN: 978-1-4471-6262-9
Online ISBN: 978-1-4471-6263-6
eBook Packages: EnergyEnergy (R0)