Skip to main content

Study of Electre II Multiple Attribute Decision-Making Method in Construction Project Management Mode Selection

  • Conference paper
  • First Online:
Informatics and Management Science I

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 204))

Abstract

Construction project management mode selection are more complex multi-attribute decision-making problems, it has very high demand to the application of multiple attribute decision-making method. Electre II of multi-attribute decision-making method takes into account the cognitive characteristics of people in decision-making, constructed two preference relations that strong is better than weak, the whole sort of multi-attribute decision-making program, which has great application value. This chapter analyzes the basic problem of the construction project management mode selection, and pointed out that the nature of the problem of multi-attribute decision-making, and give basic steps about the application of Electre II method.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Tam CM, Thomas KLT, Chiu CW, Ivan WHF (2002) Non-structural fuzzy decision support system for evaluation of construction safety management system. Int J Project Manage 20(4):303–313

    Article  Google Scholar 

  2. Pan N-F (2008) Fuzzy AHP approach for selecting the suitable bridge construction method. Autom Constr 17(8):958–965

    Article  Google Scholar 

  3. Banias G, Achillas C, Christos V, Moussiopoulos N, Tarsenis S (2010) Assessing multiple criteria for the optimal location of a construction and demolition waste management facility. Build Environ 45(10):2317–2326

    Article  Google Scholar 

  4. Marques G, Gourc D, Lauras M (2011) Multi-criteria performance analysis for decision-making in project management. Int J Project Manage 29(8):1057–1069

    Article  Google Scholar 

  5. Duckstein L, Gershon M (1983) Multicriterion analysis of a vegetation management problem using Electre II. Appl Math Model 7(4):254–261

    Article  MATH  Google Scholar 

  6. Hokkanen J, Salminen P, Rossi E, Ettala M (1995) The choice of a solid waste management system using the Electre II decision-aid method. Waste Manage Res 13(2):175–191

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jingzhong Ma .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag London

About this paper

Cite this paper

Ma, J., Liang, Y. (2013). Study of Electre II Multiple Attribute Decision-Making Method in Construction Project Management Mode Selection. In: Du, W. (eds) Informatics and Management Science I. Lecture Notes in Electrical Engineering, vol 204. Springer, London. https://doi.org/10.1007/978-1-4471-4802-9_42

Download citation

  • DOI: https://doi.org/10.1007/978-1-4471-4802-9_42

  • Published:

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-4471-4801-2

  • Online ISBN: 978-1-4471-4802-9

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics