Skip to main content

Design of Maintenance System for UPS

  • Conference paper
  • First Online:
Informatics and Management Science III

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 206))

  • 731 Accesses

Abstract

According to the present operation of UPS in electric railway, sum up the three key problems existing in its application as follows. First, UPS performing a self-test automatically is unable to absolutely detect the failure battery. Second, in electrified railway, UPS battery keeps in the floating charge state for a long time, which reduces battery lifetime. Third, discharge time of battery is determined on the basis of battery capacity. The accurate measurement of battery capacity is getting more and more important to avoid deep discharge. However, with complex chemical properties of battery, to achieve accurate measurement of battery capacity is impossible at present. So, to solve the three problems above, an experiment has been conducted and a system has been designed on the basis of experimental data.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Sklieau RD (1994) A diagnostic testing program for large lead acid storage battery banks. IEEE Trans Ind Appl 21(10):31–34

    Google Scholar 

  2. Li YP, Liu QZ (2011) The relation between discharge voltage and residual capacity of VRLB in stand-alone PV system. Battery 87:99–120

    Google Scholar 

  3. O MS (2004) The present situation and the development of capacity estimation of VRLA. Battery 55(2):59–63

    Google Scholar 

  4. Thomas L (1994) Comprehensive noninvasive battery monitoring of lead-acid storage cells in unattended location. In: IEEE international communications and energy conference, vol 88. pp 594–601

    Google Scholar 

  5. Carle RH (2007) An overview of UPS systems: technology, application and maintenance. Ind Appl Mag IEEE 1(6):159–191

    Google Scholar 

  6. Holt DJ (2000) High power valve regulated lead-acid batteries for new vehicle requirements. Automot Eng Int 33(4):24–37

    MathSciNet  Google Scholar 

  7. Breeher C, Rseberg LA (2000) A method for identifying the full charging point and the degree of deterioration of lead-acid batteries. In: Twenty-second international telecommunications energy conference, vol 12(11). pp 609–614

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Feng Zhao .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag London

About this paper

Cite this paper

Zhao, F., Wang, Q., He, J. (2013). Design of Maintenance System for UPS. In: Du, W. (eds) Informatics and Management Science III. Lecture Notes in Electrical Engineering, vol 206. Springer, London. https://doi.org/10.1007/978-1-4471-4790-9_12

Download citation

  • DOI: https://doi.org/10.1007/978-1-4471-4790-9_12

  • Published:

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-4471-4789-3

  • Online ISBN: 978-1-4471-4790-9

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics