Abstract
Control and management of waste materials created during stone production is one of the most important problems of stone industry and modern societies today. Waste materials which are different depending on properties of structure and construction technique generally consist of materials such as concrete, brick, stone, briquette, wood, metal, glass, gypsum, plastic, ceramic [1]. This paper is about how to optimize the stone industry. The plant considered as the leader level will make a strategy to utilize the wastes amount for waste department. The waste department considered as the follower level will make a decision to produce different stone products under the utilizing constraint. Due to the lack of historical data, some emission coefficients are considered as fuzzy numbers.Therefore, a bi-level multiobjective optimization model with possibilistic constraints are developed to get the maximum profit and control the pollution. At the end, a case study is proposed to show the efficiency of the proposed model.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Altuncua D, Kasapsekina M (2011) Management and recycling of constructional solid waste in Turkey. In: International Conference on Green Buildings and Sustainable Cities
Aukour F, Al-Qinna M (2008) Marble production and environmental constrains: Case study from Zarqa Governorate, Jordan. Jordan Journal of Earth and Environmental Sciences 1:11–21
Yao LM, Xu JP (2012) A stone resource assignment model under the fuzzy environment.Mathematical Problems in Engineering (accepted)
Nasserdine K, Mimi Z, Bevan B et al (2009) Environmental management of the stone cutting industry. Journal of Environmental Management 90:466–470
Corinaldesi V, Moriconi G, Naik TR (2010) Naik characterization of marble powder for its use in mortar and concrete. Construction and Building Materials 24:113–117
Saboya F, Xavier GC, Alexandre J (2007) The use of the powder marble by-product to enhance the properties of brick ceramic. Construction and Building Materials 21:1950–1960
Bilgin N, Yeprem HA, Arslan S et al (2012) Use of waste marble powder in brick industry. Construction and Building Materials 29:449–457
Dunster AM (2007) Crushed waste stone and production waste in concrete landscaping products. Characterisation of Mineral Wastes, Resources and Processing technologies — Integrated waste management for the production of construction material
Senturk A, Gunduz L, Tosun Y et al (1996) Marble technology. Tugra Pres, Isparta
Dubois D, Prade H (1978) Operations on fuzzy numbers. International Journal of System Sciences 9:613–626
Kaufmann A (1985) Introduction to fuzzy arithmetic: Theory and applications. Van Nostrand Reinhold, New York
Hejazi SR, Memariani A, Jahanshahloo G et al (2002) Linear bilevel programming solution by genetic algorithm. Computers and Operations Research 29:1913–1925
Gendreau M, Marcotte P, Savard G (1996) A hybrid tabu-ascent algorithm for the linear bilevel programming problem. Journal of Global Optimization 29:217–233
Muhammad A (2011) Temporary workforce planning with firm contracts: A model and a simulated annealing heuristic. Mathematical Problems in Engineering Volume. http://www.hindawi.com/journals/mpe/2011/209693/
Ryu JH, Dua V, Pistikopoulos EN (2004) Bi-level programming framework for enterprisewide process networks under uncertainty. Computers and Chemical Engineering 28:1121–1129
Takama N, Umeda T (1980) Multi-level, multi-objective optimization in processing engineering. Chemical Engineering Science 36:129–136
TeresaW, Som S, Mengqi H (2011) The application of memetic algorithms for forearm crutch design: A case study. Mathematical Problems in Engineering http://www.hindawi.com/journals/mpe/2011/162580/
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag London
About this paper
Cite this paper
Nadeem, A.H., Hashim, M., Nazim, M. (2013). A Bi-level Multiobective Optimization Model for Risk Management to Utilize Wastes in Stone Industry under Fuzzy Environment. In: Xu, J., Yasinzai, M., Lev, B. (eds) Proceedings of the Sixth International Conference on Management Science and Engineering Management. Lecture Notes in Electrical Engineering, vol 185. Springer, London. https://doi.org/10.1007/978-1-4471-4600-1_34
Download citation
DOI: https://doi.org/10.1007/978-1-4471-4600-1_34
Published:
Publisher Name: Springer, London
Print ISBN: 978-1-4471-4599-8
Online ISBN: 978-1-4471-4600-1
eBook Packages: EngineeringEngineering (R0)