Risk Based Approach to Define Allowed Outage Times of Electric Power Supply Systems at the TVO I/II Plant

  • Conference paper
Probabilistic Safety Assessment and Management ’96

Abstract

The Limiting Conditions for Operation (LCO) and Allowed Outage Times (AOTs) given in Technical Specifications (TechSpec) were originally set for Electric Power Supply Systems (EPSS) using deterministic criteria and qualitative analysis, following similar principles as for the frontline safety systems. Because of diverse functional consequences, the safety impact of EPSS failures has been difficult to assess in a balanced way prior to being able to use a plant specific PSA. This background led to the incentive to improve the consistency of the current requirements. An integrated approach to evaluate risk impact of single and multiple failures was developed. Our paper will describe the main features of the developed approach, including the applied working criteria for the risk-based setup of AOTs and action statements, which considers several risk measures in parallel.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Himanen, R., Use of PSA as a tool to monitor and enhance safety of TVO NPP, TOPSAFE’ 95 Conference, Budapest, September 24–27, 1995.

    Google Scholar 

  2. Kosonen, M. & Mankamo, T., Risk-based approach to define Limiting Conditions of Operation and Allowed Outage Times for electrical power supply systems. IAEA Technical Committee Meeting on Procedures for Use of PSA for Optimizing NPP Operational Limits and Conditions, Barcelona, 20–23 September 1993. Proceedings.

    Google Scholar 

  3. T-Book. Reliability data book of components in Nordic NPPs, 3rd edition. Prepared by ATV Office, Vattenfall AB and Studsvik AB, 1992.

    Google Scholar 

  4. Risk-based optimization of technical specifications for operation of nuclear power plants. IAEA-TECDOC-729, December 1993.

    Google Scholar 

  5. Handbook of Methods for Risk-Based Analyses of Technical Specifications. Prepared by Samanta, P.K. & Kim, I.S. (BNL), Mankamo, T. (Avaplan Oy) and Vesely, W.E. (SAIC) for USNRC, Report NUREG/CR-5995, November 1994.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1996 Springer-Verlag London

About this paper

Cite this paper

Pesonen, J., Kosonen, M., Mankamo, T. (1996). Risk Based Approach to Define Allowed Outage Times of Electric Power Supply Systems at the TVO I/II Plant. In: Cacciabue, P.C., Papazoglou, I.A. (eds) Probabilistic Safety Assessment and Management ’96. Springer, London. https://doi.org/10.1007/978-1-4471-3409-1_32

Download citation

  • DOI: https://doi.org/10.1007/978-1-4471-3409-1_32

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-4471-3411-4

  • Online ISBN: 978-1-4471-3409-1

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics