Skip to main content

Optimising Preventive Maintenance Strategy for Production Lines

  • Chapter
Asset Condition, Information Systems and Decision Models

Part of the book series: Engineering Asset Management Review ((EAMR))

Abstract

Preventive Maintenance (PM) is often applied to improve the reliability of production lines. A Split System Approach (SSA) based methodology is presented to assist in making optimal PM decisions for serial production lines. The methodology treats a production line as a complex series system with multiple (imperfect) PM actions over multiple intervals. The conditional and overall reliability of the entire production line over these multiple PM intervals are hierarchically calculated using SSA, and provide a foundation for cost analysis. Both risk-related cost and maintenance-related cost are factored into the methodology as either deterministic or random variables. This SSA based methodology enables Asset Management (AM) decisions to be optimised considering a variety of factors including failure probability, failure cost, maintenance cost, PM performance, and the type of PM strategy. The application of this new methodology and an evaluation of the effects of these factors on PM decisions are demonstrated using an example. The results of this work show that the performance of a PM strategy can be measured by its Total Expected Cost Index (TECI). The optimal PM interval is dependent on TECI, PM performance and types of PM strategies. These factors are interrelated. Generally, it was found that a trade-off between reliability and the number of PM actions needs to be made so that one can minimise Total Expected Cost (TEC) for asset maintenance.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Dallery Y, Bihan HL (1999) An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. Int J of Production Research 37(5):1093-1117

    Article  MATH  Google Scholar 

  • Liberopoulos G, Tsarouhas P (2004) Reliability analysis of an automated pizza production line. J of Food Engineering. In press

    Google Scholar 

  • Miltenburg J (2002) The effect of breakdowns on U-shaped production lines. Int J of Production Research 38(2): 352-364

    Google Scholar 

  • Cavory G, Dupas R, Goncalves G (2001) A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line. Int J of Production Economics 74(1):135-146

    Article  Google Scholar 

  • Percy DF, Kobbacy KAH, Fawzi BB (1997) Setting preventive maintenance schedules when data are sparse. Int J of Production Economics 51(2):223-234

    Article  Google Scholar 

  • Charepnsuk C, Nagarur N, Tabucanon MT (1997) A multicriteria approach to the selection of preventive maintenance intervals. Int J of Production Economics 49(1):55-64

    Article  Google Scholar 

  • Jiang R, Murthy DNP (2008) Maintenance: decision models or management. Science Press, Beijing

    Google Scholar 

  • Ebeling CE (1997) An Introduction to Reliability and Maintainability Engineering. The McGraw-Hill Company Inc., New York 124–128

    Google Scholar 

  • Khan FI, Haddara MM (2003) Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning. J of Loss Prevention in the Process Industries 16(6):561-573

    Article  Google Scholar 

  • Krishnasamy L, Khan F, Haddara M (2005) Development of a risk-based maintenance (RBM) strategy for a power-generating plant. J of Loss Prevention in the Process Industries 18(2):69-81

    Article  Google Scholar 

  • Kierulff HE (2007) The replacement decision: Getting it right. Business Horizons 50(3):231-237

    Article  Google Scholar 

  • Tsang AHC, Yeung WK, Jardine AKS, Leung BPK (2006) Data management for CBM optimization. J of Quality in Maintenance Engineering 12(1):37-51

    Article  Google Scholar 

  • Kallen MJ, van Noortwijk, JM (2003) Optimal maintenance decisions under imperfect inspection. Reliability Engineering & System Safety (Selected papers from ESREL 2003) 90(2-3):177-185

    Article  Google Scholar 

  • Sun Y, Ma L, Mathew J (2004) Reliability prediction of repairable systems for single component repair. in: Proceedings of International Conference on Intelligent Maintenance System. Arles, France: IMS, S2-A.

    Google Scholar 

  • Sun, Y, Ma L, Morris J (2009) A practical approach for reliability prediction of pipeline systems. Eur J of Operational Research 198(1):210-214

    Article  MATH  Google Scholar 

  • Sun Y, Ma L, Mathew J (2007) Prediction of system reliability for multiple component repairs. in: Proceedings of The 2007 IEEE International Conference on Industrial Engineering and Engineering Management. 2007. Singapore: IEEE, 1186-1190

    Google Scholar 

  • Kelly A (1984) Maintenance Planning and Control. Butterworth & Co Ltd., Cambridge

    Google Scholar 

  • Pham H (2003) ed. Handbook of Reliability Engineering. Springer, London

    Google Scholar 

  • Blischke WR, Murthy DNP (2000) Reliability – Modelling, Prediction, and Optimization. John Wiley & Sons Inc., New York 143-239

    Book  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag London Limited

About this chapter

Cite this chapter

Sun, Y., Ma, L., Mathew, J. (2012). Optimising Preventive Maintenance Strategy for Production Lines. In: Amadi-Echendu, J., Willett, R., Brown, K., Mathew, J. (eds) Asset Condition, Information Systems and Decision Models. Engineering Asset Management Review. Springer, London. https://doi.org/10.1007/978-1-4471-2924-0_7

Download citation

  • DOI: https://doi.org/10.1007/978-1-4471-2924-0_7

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-4471-2923-3

  • Online ISBN: 978-1-4471-2924-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics