Abstract
Advances in modeling production system behavior over the past three decades have made it apparent that work-in-process (WIP) inventories, created by the dynamics of manufacturing systems, are an important characteristic of these systems. Furthermore, the recognition of the importance of lead times and the variability of lead times for system performance has lent additional emphasis to this behavior. Consequently, consideration of WIP and lead times has been a key aspect addressed in the analysis and development of various types of scheduling and job release systems, of which Kanban and workload-based methods are examples.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Asmundsson J, Rardin RL, Uzsoy R (2006) “Tractable nonlinear production planning models for semiconductor wafer fabrication facilities,” IEEE Trans Semicond Manuf 19(1):1–17
Bechte W (1982) “Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release”. 25th Annual International Conference. Proceedings, APICS, APICS Fall Church VA, pp 67–72
Bertrand J (1981) “The effect of workload control on order flow-times”. Proc. IXth IFORS Conference on Operations Research. North Holland, Amsterdam
Bertrand JWM (1983) “The use of workload information to control job lateness in controlled and uncontrolled release production systems”. J Oper Manag 3:67–78
Bertrand JWM (1985) “Multiproduct optimal batch sizes with in-process inventories and multiwork centres”. IIE Trans 17:157–163
Bitran GR, Haas EA, Matsuo H (1986) “Production planning of style goods with high setup costs and forecast revisions.” Oper Res 34(2):226–236
Bitran GR, Yanasse HH (1984) “Deterministic approximations to stochastic production problems.” Oper Res 32(5):999–1018
Bowman EH (1956) “Production scheduling by the transportation method of linear programming.” Oper Res 4(1):100–103
Charnes A, Cooper WW (1959) “Chance constrained programming.” Manag Sci 5:73–79
Deleersnyder JL, Hodgson TJ, Muller H, O’Grady PJ (1989) “Kanban controlled pull systems: an analytic approach”. Manag Sci 35:1079–1091
Denardo EV, Tang CS (1992) “Linear control of a markov production system”. Oper Res 40: 259–278
Gferer H, Zäpfel G (1995) “Hierarchical model for production planning in case of uncertain demand.” Eur J Oper Res 86(1):142–161
Graves SC (1986) “A tactical planning model of a job shop”. Oper Res 34:522–533
Hausman WH, Sides RGS (1974) “Mail-order demands for style goods: Theory and data analysis,” Manag Sci 20:191–202
Hanssmann F, Hess SW (1960) “A linear programming approach to production and employment scheduling,” Manag Tech 1
Hax AC (1978). “Aggregate production planning”. In: Moder J, Elmaghraby SE (eds.) Handbook of operation research, Chap. 5, vol. 2. Van Nostrand, Reinhold
Homem-de-Mello T, Shapiro A, Spearman ML (1999) “Finding optimal material release times using simulation-based optimization.” Manag Sci 45(1):86–102
Holt CC, Modigliani F, Muth JF, Simon HA (1960) Planning production, inventories and work force. Prentice-Hall, Englewood Cliffs, NJ
Karmarkar US (1987a) “The multilocation multi-period inventory problem: bounds and approximations,” Manag Sci 33:86–94
Karmarkar US (1987b) “Lot sizes, lead times and in-process inventories”. Manag Sci 33:409–418
Karmarkar US (1989) “Capacity loading and release planning with work-in-progress (WIP) and leadtimes”. J Manuf Oper Manag 2:105–123
Karmarkar US (1993) “Manufacturing lead times, order release and capacity loading”. In: Graves S, Rinnooy Kan AHG, Zipkin P (eds.) Handbook in operations research and management science, Vol. 4. Logistics of Production and Inventory. North Holland
Karmarkar US, Kekre S (1989) “Batching policy in Kanban systems”. J Manuf Syst 8:317–328
Karmarkar US, Kekre S, Kekre S, Freeman S (1985) “Lotsizing and lead time performance in a manufacturing cell”. Interfaces 15:1–9
Karmarkar US, Lin S (1988) “Production planning with uncertain yields and demands”. Simon School of Management Working Paper, University of Rochester
Karmarkar US, Rajaram K (2002) “Product cycling with uncertain yields: analysis and application to the process industry” Oper Res 50:680–691
Karmarkar US, Yoo J (1994) “Stochastic dynamic product cycling problem”. Eur J Oper Res 73:360–373
Kimball GE (1988) “General principles of inventory control”. J. Manuf Oper Manag 1:119–130
Land M, Gaalman G (1996) “Workload control concepts in job shops – a critical assessment”. Int J Prod Econ 46–47:535–548
Lasdon LS, Terjung RC (1971) “An efficient algorithm for multi-item scheduling”. Oper Res 19(4):946–969
Lasserre JB, Mercé C (1990) Robust hierarchical production planning under uncertainty. Ann Oper Res 26:73–87
Lin SC (1986) “Production with uncertainty”. Ph.D. Dissertation, William E. Simon Graduate School of Business Administration, University of Rochester, unpublished
Manne AS (1958) “Programming of economic lot sizes.” Manag Sci 4:115–135
Missbauer H (2002) “Aggregate order release planning for time-varying demand”. Int J Prod Res 40(3):699–718
Nam S, Logendran R (1992) “Aggregate production planning – a survey of models and methodologies”. Eur J Oper Res 61:255–272
Pahl J, Voß S, Woodruff DL (2005) “Production planning with load dependent lead times”. 4OR Q J Oper Res 3(4):257–302
Perona M, Portioli A (1998) “The impact of parameters setting in load oriented manufacturing control”. Int J Prod Econ 55:133–142
Riaño G (2002) “Transient behavior of stochastic networks: application to production planning with load-dependent lead times.” Ph.D. Dissertation, Georgia Institute of Technology
Sahinidis NV (2004) “Optimization under uncertainty: state-of-the-art and opportunities”. Comput Chem Eng 28:971–983
Spearman ML, Zazanis MA (1992) “Push and pull production systems: issues and comparisons”. Oper Res 40:521–532
Zijm WHM, Buitenhoek R (1996) “Capacity planning and leadtime management”. Int J Prod Econ 46–47:165–179
Zipkin PH (1986) “Models for design and control of stochastic, multi-item batch production systems”. Oper Res 34:91–104
Acknowledgements
The authors appreciate the assistance provided by Mike Pangburn in conducting numerical experiments with the algorithms.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2011 Springer New York
About this chapter
Cite this chapter
Dobson, G., Karmarkar, U.S. (2011). Production Planning Under Uncertainty with Workload-Dependent Lead Times: Lagrangean Bounds and Heuristics. In: Kempf, K., Keskinocak, P., Uzsoy, R. (eds) Planning Production and Inventories in the Extended Enterprise. International Series in Operations Research & Management Science, vol 152. Springer, New York, NY. https://doi.org/10.1007/978-1-4419-8191-2_1
Download citation
DOI: https://doi.org/10.1007/978-1-4419-8191-2_1
Published:
Publisher Name: Springer, New York, NY
Print ISBN: 978-1-4419-8190-5
Online ISBN: 978-1-4419-8191-2
eBook Packages: Business and EconomicsBusiness and Management (R0)