Beyond the EVM Fundamentals

  • Chapter
  • First Online:
Measuring Time

Part of the book series: International Series in Operations Research & Management Science ((ISOR,volume 136))

  • 2844 Accesses

Abstract

Despite the ever growing positive attention to EVM, the use of earned value metrics has been questioned by various authors when it is applied to highly complex and/or innovative projects. Indeed, EVM rests on a fundamental assumption that project activities and precedence relations are known in advance, and hence, assumes a project setting where estimates (activity duration, resource requirements, unexpected events, etc.) can be given within a certain range. However, projects often do not fulfil these assumptions but, on the contrary, are commonly plagued by fundamentally unforeseeable events and/or unknown interactions among various actions and project parts (Loch et al, 2006). The straight application of the standard EVM metrics and methods is certainly insufficient for projects where these assumptions do not hold. We refer to the book by Loch et al (2006) for a more general framework where the authors position and classify the sources of risk by the foreseeability of the underlying influence factors and by the complexity of the project. We also cite the letter to the editor of Harvard Business Review from Cooper (2003) as a response to the article written by Fleming and Koppelman (2003). In this letter, the author argues that the use of earned value management can be questioned when it is applied to highly complex projects. Due to the cycles of rework, the accuracy of the EVM metrics can be biased, leading to incorrect management decisions.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mario Vanhoucke .

Rights and permissions

Reprints and permissions

Copyright information

© 2009 Springer Science+Business Media, LLC

About this chapter

Cite this chapter

Vanhoucke, M. (2009). Beyond the EVM Fundamentals. In: Measuring Time. International Series in Operations Research & Management Science, vol 136. Springer, Boston, MA. https://doi.org/10.1007/978-1-4419-1014-1_2

Download citation

  • DOI: https://doi.org/10.1007/978-1-4419-1014-1_2

  • Published:

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-1-4419-1013-4

  • Online ISBN: 978-1-4419-1014-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics