Abstract
To gain an edge over competitors in an increasingly global and competitive marketplace, companies today need to differentiate themselves not only in cost, but in the overall “value” of the products and the services they offer. As customers demand more and more variety of products, better, cheaper, and faster, an essential value feature for customer acquisition and retention is the ability to quote short and reliable lead times. Reliability is important for customers especially in a business-to-business setting, because it allows them to plan their own operations with more reliability and confidence [67].
Pinar Keskinocak is supported by NSF Career Award DMII-0093844.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
N.R. Adam, J.W.M. Bertrand, D.C. Morehead, and J. Surkis. Due date assignment procedures with dynamically updated coefficients for multilevel assembly job shops. European Journal of Operational Research, 77: 429–439, 1994.
J. Adams, E. Balas, and D. Zawack. The shifting bottleneck procedure for job shop scheduling. Management Science, 34: 391–401, 1988.
U. Bagchi, Y.L. Chang, and R. Sullivan. Minimizing absolute and squarred deviations of completion imes with different earliness and tardiness penalties and a common due date. Naval Research Logistics Quarterly, 34: 739–751, 1987.
K.R. Baker. The effects of input control in a simple scheduling model. Journal of Operations Management, 4: 94–112, 1984.
K.R. Baker. Sequencing rules and due-date assignments in a job shop. Management Science, 30 (9): 1093–1104, 1984.
K.R. Baker and J.W.M. Bertrand. A comparison of due-date selection rules. AILE Transactions, pages 123–131, June 1981a.
K.R. Baker and J.W.M. Bertrand. An investigation of due date assignment rules with constrained tightness. Journal of Operations Management, 1 (3): 37–42, 1981b.
K.R. Baker and J.W.M. Bertrand. A dynamic priority rule for scheduling against due-dates. Journal of Operations Management, 3 (1): 37–42, 1982.
K.R. Baker and J.J. Kanet. Job shop scheduling with modified due dates. Journal of Operations Management, 4 (1): 11–23, 1983.
K.R. Baker and J.J. Kanet. Improved decision rules in a combined system for minimizing job tardiness. Journal of Operations Management, 4 (1): 11–23, 1984.
K.R. Baker and G.D. Scudder. On the assignment of optimal due dates. Journal of the Operational Research Society, 40 (1): 93–95, 1989.
J.W.M. Bertrand. The effect of workload dependent due-dates on job shop performance. Management Science, 29 (7): 799–816, 1983.
G.R. Bitran and D. Tirupati. Multiproduct queuing networks with deterministic routing: decomposition approach and the notion of interference. Management Science, 34 (1): 75–100, 1988.
J.H. Bookbinder and A.I. Noor. Setting job-shop due-dates with service-level constraints. Journal of the Operational Research Society, 36 (11): 1017–1026, 1985.
T. Boyaci and S. Ray. Product differentiation and capacity cost interaction in time and price sensitive markets. Manufacturing and Service Operations Management, 5 (1): 18–36, 2003.
K. Charnsirisakskul, P. Griffin, and P. Keskinocak. Order selection and scheduling with lead-time flexibility. Working Paper, ISYE, Georgia Institute of Technology.
K. Charnsirisakskul, P. Griffin, and P. Keskinocak. Pricing and scheduling decisions with lead-time flexibility. Technical report, School of Industrial and Systems Engineering, Georgia Institute of Technology, 2003.
S. Chatterjee, S.A. Slotnick, and M.J. Sobel. Delivery guarantees and the interdependence of marketing and operations. Production and Operations Management, 11 (3): 393–409, 2002.
T.C.E. Cheng. Optimal due-date determination and sequencing of n jobs on a single machine. Journal of the Operational Research Society, 35 (5): 433–437, 1984.
T.C.E. Cheng. Optimal due-date assignment for a single machine sequencing problem with random processing times. International Journal of Systems Science, 17: 1139–1144, 1986.
T.C.E. Cheng. An algorithm for the con due-date determination and sequencing problem. Computers and Operations Research, 14: 537–542, 1987.
T.C.E. Cheng. An alternative proof of optimality for the common due-date assignment problem. European Journal of Operational Research, 1988.
T.C.E. Cheng. Optimal total-work-content-power due-date determination and sequencing. Computers and Mathematics with Applications, 1988.
T.C.E. Cheng. On a generalized optimal common due-date assignment problem. Engineering Optimization, 15: 113–119, 1989.
T.C.E. Cheng. Optimal assignment of slack due dates and sequencing in a single-machine shop. Appl. Math. Lett., 2 (4): 333–335, 1989.
T.C.E. Cheng and M.C. Gupta. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38: 156–166, 1989.
R.W. Conway. Priority dispatching and job lateness in a job shop. The Journal of Industrial Engineering, 16 (4): 228–237, 1965.
N.P. Dellaert. Production to order. Lecture Notes in Economics and Mathematical Systems, 333, 1989. Springer, Berlin.
N.P. Dellaert. Due-date setting and production control. International Journal of Production Economics, 23: 59–67, 1991.
I. Duenyas. Single facility due date setting with multiple customer classes. Management Science, 41 (4): 608–619, 1995.
I. Duenyas and W.J. Hopp. Quoting customer lead times. Management Science, 41 (1): 43–57, 1995.
F.F. Easton and D.R. Moodie. Pricing and lead time decisions for maketo-order firms with contingent orders. European Journal of operational research, 116: 305–318, 1999.
S. Eilon and I.G. Chowdhury. Due dates in job shop scheduling. International Journal of Production Research, 14 (2): 223–237, 1976.
S. Eilon and R.M. Hodgson. Job shop scheduling with due dates. International Journal of Production Research, 6 (1): 1–13, 1967.
M. Elhafsi. An operational decision model for lead-time and price quotation in congested manufacturing systems. European Journal of Operational Research, 126: 355–370, 2000.
M. Elhafsi and E. Rolland. Negotiating price/delivery date in a stochastic manufacturing environment. HE Transactions, 31: 225–270, 1999.
D.A. Elvers. Job shop dispatching rules using various delivery date setting criteria. Production and Inventory Management, 4: 62–70, 1973.
S.T. Enns. Job shop lead time requirements under conditions of controlled delivery performance European Journal of Operational Research, 77: 429–439, 1994.
S.T. Enns. Lead time selection and the behaviour of work flow in job shops. European Journal of Operational Research, 109: 122–136, 1998.
L. Enos. Report: Holiday e-sales to double. E-Commerce Times,September 6 2000. http://www.ecommercetimes.com/perl/story/4202.html.
T.D Fry, P.R. Philipoom, and R.E. Markland. Due date assignment in a multistage job shop. IIE Transactions, pages 153–161, June 1989.
P. Glasserman and Y. Wang. Leadtime-inventory trade-offs in assembleto-order systems. Operations Research, 46 (6): 858–871, 1998.
M.X. Goemans, M. Queyranne, A.S. Schulz, M. Skutella, and Y. Wang. Single machine scheduling with release dates. SIAM Journal on Discrete Mathematics, 15: 165–192, 2002.
M.X. Goemans, J. Wein, and D.P. Williamson. A 1.47-approximation algorithm for a preemptive single-machine scheduling problem. Operations Research Letters, 26: 149–154, 2000.
V.S. Gordon. A note on optimal assignment of slack due-dates in single-machine scheduling. European Journal of Operational Research, 70: 311–315, 1993.
R.L. Graham, E.L. Lawler, J.K. Lenstra, and A.H.G. Rinnooy Kan. Optimiztion and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, (5): 287–326, 1979.
G.I. Green and L.B. Appel. An empirical analysis of job shop dispatch rule selection. Journal of Operations Management, 1:197–203, 1981.
A. Greene. The flow connection for e-business. Manufacturing Systems Magazine, February 2000.
S.K. Gupta and J. Kyparisis. Single machine scheduling research. Omega, 15: 207–227, 1987.
D.N. Halsall, A.P. Muhlemann, and D.H.R. Price. A review of production planning and scheduling in smaller manufacturing companies in the uk. Production Planning and Control, 5: 485–493, 1984.
C.W.L. Hart. The power of unconditional service guarantees. Harvard Business Review, pages 54–62, July-August 1988.
N. Hill. Delivery on the dot–or a refund! Industrial Marketing Digest, 14 (2): 43–50, 1989.
D.S. Hochbaum, K. Jansen, J.D.P. Rolim, and A. Sinclair, editors. Randomization, Approximation, and Combinatorial Algorithms and Techniques, Third International Workshop on Randomization and Approximation Techniques in Computer Science, and Second International Workshop on Approximation Algorithms for Combinatorial Optimization Problems RANDOM-APPROX’99, Berkeley, CA, USA, August 8–11, 1999, Proceedings, volume 1671 of Lecture Notes in Computer Science. Springer, 1999.
M. Hopp, W. Spearman and D. Woodruff. Practical strategies for lead time reduction. Manufacturing Review, 3: 78–84, 1990.
W.J. Hopp and M.L. Roof Sturgis. Quoting manufacturing due dates subject to a service level constraint. HE Transactions, 32: 771–784, 2000.
P.Y. Huang. A comparative study of priority dispatching rules in a hybrid assembly/job shop. International Journal of Production Research, 22 (3): 375–387, 1984.
J.R. Jackson. Job shop-lie queuing systems. Management Science, 10: 131–142, 1963.
P. Kaminsky and Z.-H. Lee. Asymptotically optimal algorithms for reliable due date scheduling. Technical report, Department of Industrial Engineering and Operations Research, University of California, Berkeley, CA, 2003.
J.J. Kanet. On anomalies in dynamic ratio type scheduling rules: A clarifying analysis. Management Science, 28 (11): 1337–1341, 1982.
J.J. Kanet and J.C. Hayya. Priority dispatching with operation due dates in a job shop. Journal of Operations Management, 2 (3): 167–175, 1982.
R. Kapuscinski and S. Tayur. Reliable due date setting in a capacitated MTO system with two customer classes. Working Paper, GSIA, Carnegie Mellon University.
U. Karmarker. Lot sizes, manufacturing lead times and throughput. Management Science, 33: 409–418, 1987.
R. Kaufman. End fixed lead times. Manufacturing Systems, pages 68–72, January 1996.
P. Keskinocak. Satisfying customer due dates effectively. Ph.D. Thesis, GSIA, Carnegie Mellon University, 1997.
P. Keskinocak, R. Ravi, and S. Tayur. Scheduling and reliable lead time quotation for orders with availability intervals and lead time sensitive revenues. Management Science, 47 (2): 264–279, 2001.
B. Kingsman, L. Worden, L. Hendry, A. Mercer, and E. Wilson. Integrating marketing and production planning in make-to-order companies. Interntional Journal of Production Economics, 30: 53–66, 1993.
B.G. Kingsman, I.P. Tatsiopoulos, and L.C. Hendry. A structural methodology for managing manufacturing lead times in make-to-order companies. Management Science, 22 (12): 1362–1371, 1976.
S.R. Lawrence. Estimating flowtimes and setting due-dates in complex production systems. HE Transactions, 27: 657–668, 1995.
Y. Lu, J.-S. Song, and D.D. Yao. Order fill rate, lead time variability, and advance demand information in an assemble-toorder system. Working Paper,2001. Columbia University, http://www.ieor.columbia.edu/yao/lsylrevlb.pdf.
H. Matsuura, H. Tsubone, and M. Kanezashi. Setting planned lead times for multi-operation jobs. European Journal of Operational Research, 88: 287–303, 1996.
S. Miyazaki. Combined scheduling system for reducing job tardiness in a job shop. International Journal of Production Research, 19 (2): 201–211, 1981.
D.R. Moodie. Demand management: The evaluation of price and due date negotiation strategies using simulation. Production and Operations Management, 8 (2): 151–162, 1999.
D.R. Moodie and P.M. Bobrowski. Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37 (5): 997–1021, 1999.
J. Orlicky. Materials Requirements Planning. McGraw Hill, Inc., New York, 1975.
K. Palaka, S. Erlebacher, and D.H. Kropp. Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand. TIE Transactions, 30: 151–163, 1998.
S. Panwalkar, M. Smith, and A. Seidmann. Common due date assignment to minimize total penalty for the one machine scheduling problem. Operations Research, 30 (1): 391–399, 1982.
P.R. Philipoom, L.P. Rees, and L. Wiegman. Using neural networks to determine internally-set due-date asignments for shop scheduling. Decision Sciences, 25 (5/6): 825–851, 1994.
P.R. Philipoom, L. Wiegman, and L.P. Rees. Cost-based due-date assignment with the use of classical and neural-network approaches. Naval Research Logistics, 44: 21–46, 1997.
M. Pinedo. Scheduling: Theory, Algorithms and Systems. Prentice Hall, New Jersey, 2002.
M.A. Quaddus. A generalized model of optimal due date assignment by linear programming. Journal of the Operational Research Society, 38: 353–359, 1987.
M.A. Quaddus. On the duality approach to optimal due date determination and sequencing in a job shop. Engineering Optimization, 10: 27 1278, 1987.
G.L. Ragatz. A note on workload-dependent due date assignment rules. Journal of Operations Management, 8 (4): 377–384, 1989.
G.L. Ragatz and V.A. Mabert. A simulation analysis of due date assignment rules. Journal of Operations Management, 5 (1): 27–39, 1984.
M. Ragavachari. A v-shape property of optimal schedule of jobs about a common due date. European Journal of Operational Research, 23: 40 1402, 1986.
S. Ray and E.M. Jewkes. Customer lead time management when both demand and price are lead time sensitive. European Journal of Operational Research, 2003.
R.S. Russell and B.W. Taylor. An evaluation of sequencing rules for an assembly shop. Decision Sciences, 16: 196–212, 1985.
A. Seidmann, S.S. Panwalkar, and M.L. Smith. Optimal assignment of due-dates for a single processor scheduling problem. International Journal of Production Research, 19 (4): 393–399, 1981.
A. Seidmann and M.L. Smith. Due date assignment for production systems. Management Science, 27 (5): 571–581, 1981.
T. Sen and S.K. Gupta. A state-of-art survey of static scheduling research involving due-dates. Omega, 12: 63–76, 1984.
J.G. Shanthikumar and J.A. Buzacott. Open queuing network models of dynamic job shops. International Journal of Production research, 19: 255–266, 1981.
J.G. Shanthikumar and J.A. Buzacott. The time spent in a dynamic job shop. European Journal of Operational Research, 17: 215–226, 1984.
J.G. Shanthikumar and U. Sumita. Approximations for the time spent in a dynamic job shop with applications to due-date assignment. International Journal of Production Research, 26 (8): 1329–1352, 1988.
B. Simon and R. Foley. Some results on sojourn times in acyclic jackson networks. Management Science, 25: 1027–1034, 1979.
D.S. Sleator and R.S. Tarjan. Amortized efficiency of list update and paging rules. Communications of the ACM, 28: 202–208, 1985.
W.E. Smith. Various optimizers for single-stage production. Naval Research Logistics Quarterly, pages 59–66, March 1956.
K.C. So. Price and time competition for service delivery. Manufacturing and Service Operations Management, 2 (4): 392–409, 2000.
K.C. So and J.-S. Song. Price, delivery time guarantees and capacity selection. European Journal of Operational Research, 111: 28–49, 1998.
H.M. Soroush. Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. European Journal of Operational Research, 113: 450–468, 1999.
M.L. Spearman and R.Q. Zhang. Optimal lead time policies. Management Science, 45 (2): 290–295, 1999.
R. Suri. Quick Response Manufacturing: A Companywide Approach to Reducing Lead Times. Productivity Press, Portland, OR, 1998.
S. Tayur. Improving operations and quoting accurate lead times in a laminate plant. Interfaces, 30 (5): 1–15, 2000.
N.R. Tobin, A. Mercer, and B. Kingsman. A study of small subcontract and make-to-order firms in relation to quotation for orders. International Journal of Operation and Production Management, 8 (6): 46–59, 1987.
G. Udo. An investigation of due-date assignment using workload information of a dynamic shop. International Journal of Production Economics, 29: 89–101, 1993.
M.M. Vig and K.J. Dooley. Dynamic rules for due date assignment. International Journal of Production Research, 29 (7): 1361–1377, 1991.
M.M. Vig and K.J. Dooley. Mixing static and dynamic flowtime estimates for due-date assignment. Journal of Operations Management, 11: 67–79, 1993.
J.K. Weeks. A simulation study of predictable due-dates. Management Science, 25 (4): 363–373, 1979.
J.K. Weeks and J.S. Fryer. A simulation study of operating policies in a hypothetical dual-constrained job shop. Management Science, 22 (12): 1362–1371, 1976.
J.K. Weeks and J.S. Fryer. A methodology for assigning minimum cost due-dates. Management Science, 23 (8): 872–881, 1977.
L.M. Wein. Due-date setting and priority sequencing in a multi class m/g/1 queue. Management Science, 37 (7): 834–850, 1991.
Z.K. Weng. Strategies for integrating lead time and customer-order decisions. HE Transactions, 31 (2): 161–171, 1999.
R.L. Winkler and W.L. Hayes. Statistics: Probability, Inference, and Decision. Holt, Rinehart and Winston, New York, 1975.
J.D. Wisner and S.P. Siferd. A survey of us manufacturing practices in make-to-order machine shops. Production and Inventory Management Journal, 36 (1): 1–7, 1995.
W.H.M. Zijm and R. Buitenhek. Capacity planning and lead time management. International Journal of Production Economics, 46–47: 165–179, 1996.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2004 Springer Science+Business Media New York
About this chapter
Cite this chapter
Keskinocak, P., Tayur, S. (2004). Due Date Management Policies. In: Simchi-Levi, D., Wu, S.D., Shen, ZJ. (eds) Handbook of Quantitative Supply Chain Analysis. International Series in Operations Research & Management Science, vol 74. Springer, Boston, MA. https://doi.org/10.1007/978-1-4020-7953-5_12
Download citation
DOI: https://doi.org/10.1007/978-1-4020-7953-5_12
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4757-1074-8
Online ISBN: 978-1-4020-7953-5
eBook Packages: Springer Book Archive