Measurement of Concrete

  • Chapter
Civil Engineering Quantities

Abstract

Class F in CESMM3 realistically prescribes separate bill items for the provision and placing of concrete. This separation is intended to assist the tenderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Copyright information

© 1993 Ivor H. Seeley

About this chapter

Cite this chapter

Seeley, I.H. (1993). Measurement of Concrete. In: Civil Engineering Quantities. Macmillan Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-22719-8_7

Download citation

  • DOI: https://doi.org/10.1007/978-1-349-22719-8_7

  • Publisher Name: Palgrave, London

  • Print ISBN: 978-0-333-58907-6

  • Online ISBN: 978-1-349-22719-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics