Abstract
An employer commissioning a building project will expect to obtain a building that satisfies his needs as to form and quality, of which he can take possession at the agreed time and for which he will pay the optimum economic price.1 It is often difficult to demonstrate achievement of the optimum price without receiving comparative tenders from independent contractors, although there has been a tendency to move towards other contractual arrangements in the post-war years.
Preview
Unable to display preview. Download preview PDF.
References
E.W. McCanlis. Tendering Procedures and Contractual Arrangements. Royal Institution of Chartered Surveyors (1967)
T. Frost. Unconventional alternatives. The Quantity Surveyor (February 1981)
The Aqua Group. Tenders and Contracts for Building. Granada (1982)
National Federation of Building Trades Employers [renamed 1984 to Building Employers’ Confederation] and the Society of Chief Quantity Surveyors in Local Government. National Schedule of Rates (1982)
Chartered Institute of Public Finance and Accountancy and Institution of Municipal Engineers. Local Authority Maintenance Work; Interim Users’ Guide to Schedules of Rates (1982)
Association of Metropolitan Authorities. Guidance Notes on Preparation of Term Contracts using Schedule of Rates (1981)
D.A. Elliott. Schedules of Rates for Local Authority Building Maintenance Work. Chartered Institute of Building, Technical Information Service No. 8 (1982)
Department of the Environment. Schedule of Rates for Building Works (1981)
L. Gardiner. Documentation for small works. The Quantity Surveyor (July 1982)
I.H. Seeley. Civil Engineering Quantities. Macmillan (1977)
P.H.P. Bennett. Architectural Practice and Procedure. Batsford (1981)
R.D.R. Pertwee. Joint venture contracting. Building Technology and Management (January 1983)
C.G. Howard. The Oxford Regional Health Authority’ s approach in the use of joint venture tendering arrangements. Proceedings of Conference of Health Authorities Regional Quantity Surveyors’ Association (June 1981)
C. Sweett. The case for negotiated building contracts. The Chartered Surveyor (March 1971)
Chartered Institute of Building. Code of Estimating Practice (1983)
H. Davis. The advantages of management contracts—apparent or real? Proceedings of Royal Institution of Chartered Surveyors, Quantity Surveyors Twelfth Triennial Conference (April 1981)
QS Digest. Management contracts. The Surveying Technician (June 1982)
G. Trickey. Design and build: the new form. Chartered Quantity Surveyor (August 1982)
R. Mortimer. Design and construct—its growth, shortcomings, etc. Proceedings of Royal Institution of Chartered Surveyors, Quantity Surveyors Twelfth Triennial Conference (April 1981)
B.J. Hill. Design and construct—a case study. Proceedings of Royal Institution of Chartered Surveyors, Quantity Surveyors Eleventh Triennial Conference (April 1978)
British Property Federation. Manual of the BPF System for Building Design and Construction (1983)
T. Chalk. Breaking the mould. Building Technology and Management (April 1984)
Author information
Authors and Affiliations
Copyright information
© 1984 Ivor H. Seeley
About this chapter
Cite this chapter
Seeley, I.H. (1984). Construction Contracts. In: Quantity Surveying Practice. Macmillan Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-17599-4_3
Download citation
DOI: https://doi.org/10.1007/978-1-349-17599-4_3
Publisher Name: Palgrave, London
Print ISBN: 978-0-333-36858-9
Online ISBN: 978-1-349-17599-4
eBook Packages: EngineeringEngineering (R0)