Skip to main content

Internal Finishes

  • Chapter
  • 111 Accesses

Part of the book series: Building and Surveying Series ((BASS))

Abstract

In the measurement of this class of work it is essential to adopt a logical sequence in the taking off work. Where the work is extensive it is advisable to prepare a schedule of finishes in the form illustrated in table 9.2 unless supplied by the architect. This will considerably simplify the taking off and reduce the liability to error.

This is a preview of subscription content, log in via an institution.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Copyright information

© 1999 Ivor H. Seeley and Roger Winfield

About this chapter

Cite this chapter

Seeley, I.H., Winfield, R. (1999). Internal Finishes. In: Building Quantities Explained. Building and Surveying Series. Red Globe Press, London. https://doi.org/10.1007/978-1-349-14653-6_9

Download citation

  • DOI: https://doi.org/10.1007/978-1-349-14653-6_9

  • Publisher Name: Red Globe Press, London

  • Print ISBN: 978-0-333-71972-5

  • Online ISBN: 978-1-349-14653-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics