Abstract
In the measurement of this class of work it is essential to adopt a logical sequence in the taking off work. Where the work is extensive it is advisable to prepare a schedule of finishes in the form illustrated in table 9.2 unless supplied by the architect. This will considerably simplify the taking off and reduce the liability to error.
This is a preview of subscription content, log in via an institution.
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Copyright information
© 1999 Ivor H. Seeley and Roger Winfield
About this chapter
Cite this chapter
Seeley, I.H., Winfield, R. (1999). Internal Finishes. In: Building Quantities Explained. Building and Surveying Series. Red Globe Press, London. https://doi.org/10.1007/978-1-349-14653-6_9
Download citation
DOI: https://doi.org/10.1007/978-1-349-14653-6_9
Publisher Name: Red Globe Press, London
Print ISBN: 978-0-333-71972-5
Online ISBN: 978-1-349-14653-6
eBook Packages: EngineeringEngineering (R0)