Abstract
In a framed building, four major areas which consume a substantial portion of the total project cost are the structural frame, architectural construction, foundations, and mechanical and electrical services. It is essential to explore all possibilities to achieve economy in each of these areas at the design stage, since investigations have indicated that about 80 per cent of the project cost is committed by the time 20 per cent of the design (sketch design stage) has been completed [1]. Further, in the present age of ever-increasing costs, the majority of the clients of building projects are insisting on projects being designed and executed to give maximum value for money. Hence professionals are employed to work as a team to an increasing extent during the design stage. As buildings become more complex and building clients more exacting in their requirements, so it becomes necessary to improve and refine the cost control tools.
This is a preview of subscription content, log in via an institution.
References
Kelly, J.R. Value analysis in early building design. In Building Cost Techniques: New Directions, edited by Brandon, P.S. Spon, London, 1982, pp. 115–125.
Trimble, E.G. and Jupp, B.C. Regression analysis as an aid to estimating and controlling the building client costs. Unpublished paper, 1973.
Gould, P.R. The development of a cost model for the heating, ventilation and air conditioning installation of a building. MSc thesis, Loughborough University of Technology, UK, 1970.
Badby, CE. Development of a cost model for the external walls, internal partitions, windows and doors of a building. MSc thesis, Loughborough University of Technology, UK, 1971.
Wood, A.S. Models for estimating the cost of piped heating systems in buildings. MSc thesis, Loughborough University of Technology, UK, 1976.
Baker, M.J. Investigation into the cost of homes for the aged. MSc thesis, Loughborough University of Technology, UK, 1974.
McCaffer, R. Some examples of the use of regression analysis as an estimating tool. Institute of Quantity Surveyors Journal, UK, December 1975, pp. 81–86.
Newton, S. ACE: Analysis of Construction Economics. Internal Report, University of Strathclyde, Glasgow, April 1982.
Schofield, D., Raftery, J. and Wilson, A. An economic model of means of escape provision in commercial buildings. In Building Cost Techniques: New Directions, edited by Brandon, P.S. Spon, London, 1982, pp. 210–220.
Murthy, C.K. A comparison of prestressed, partially prestressed and reinforced concrete structures and comparison of structural costs and structural systems for some commercial buildings in Singapore. C.I. Conference on Our World in Concrete and Structures, 1977.
Bennett, J. Cost planning and computers. In Building Cost Techniques: New Directions, edited by Brandon, P.S. Spon, London, pp. 17–2
Author information
Authors and Affiliations
Copyright information
© 1994 Surinder Singh
About this chapter
Cite this chapter
Singh, S. (1994). Introduction. In: Cost Estimation of Structures in Commercial Buildings. Macmillan Building and Surveying Series. Palgrave, London. https://doi.org/10.1007/978-1-349-13030-6_1
Download citation
DOI: https://doi.org/10.1007/978-1-349-13030-6_1
Publisher Name: Palgrave, London
Print ISBN: 978-1-349-13032-0
Online ISBN: 978-1-349-13030-6
eBook Packages: EngineeringEngineering (R0)