Skip to main content
  • 88 Accesses

Summary

Just-in-Time manufacturing requires the production of smaller and smaller batches, to respond quickly to customer demand and to reduce inventories and their associated costs.

To minimise waste, each item must be produced in the exact quantity needed and at the right time. A pull production system is able to achieve these results and fast production scheduling is of great support if it is able to eliminate the waiting time of parts queuing in front of machine tools.

The Authors have been interested in scheduling and sequencing in job-shop and in flow-shop environments. The algorithm considered is able to optimise several measures of performance of N jobs on M machines with a short computation time. In particular the algorithm can evaluate and minimise the time spent by parts waiting for the next operation on a new machine. This technique considers pairs of jobs, thus eliminating a great amount of the computer time needed to forecast the optimal sequence and is able to annul the waiting time of pieces.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. T.W. JOHNSON and G.H. MANOOCHEHRI (1990) Adopting JIT: Implications for Worker Roles and Human Resource Management, IM, May/June, pp. 2–6.

    Google Scholar 

  2. H. BERA, G. PELLEGRINI, E. GENTILI (1989) Flow-Shop Scheduling under Stochastic Tool-Life Constraint, Acts of the 4th Int. Conf. on CAD/CAM, New Delhi, pp. 589–597.

    Google Scholar 

  3. G. PELLEGRINI, E. GENTILI, H. BERA (1990) Identical Job Batches Scheduling under Stochastic Environment, Proc. of the Twenty-eighth Int. MATADOR Conf., pp. 115–118.

    Google Scholar 

  4. G. PELLEGRINI, E: GENTILI, H. BERA (1989), Computer Aided Job-Shop Scheduling Under Stochastic Job Arrival Constraint, AMSE Proc., Brighton Int. Conf., pp. 151–160.

    Google Scholar 

  5. BRIT. STANDARDS ORGAN., BS 5191, (1975), Glossary of Production Planning and Control Terms, published by the British Standards Instituion, pp. 1–40.

    Google Scholar 

  6. S. EILON (1980) The Production Scheduling Problem, Management and Production Readings, Edited by R. Wild, published by Penguin, pp. 10–53.

    Google Scholar 

  7. S.M. JOHNSON (1954) Opt i mal Two and Three Stage Production Schedules with Set-ups Included, Navel Research Quarterly, Vol. 1, No. 1, March, pp. 61–68.

    Google Scholar 

  8. R. BELLMAN (1957) Dynamic Programming, Princeton University Press, pp. 3–14.

    MATH  Google Scholar 

  9. E.L. LAWLER and D.E. WOOD (1966) Branch and Bound Methods: a Survey, Operation Research, Vol. 14, pp. 24–29.

    MathSciNet  Google Scholar 

  10. K.R. BAKER (1975) Introduction to Sheduling and Sequencing, John Wiley, pp. 48–60.

    Google Scholar 

  11. J.R. KING (1976) The Theory Practice Gap in Job Shop Scheduling, The Production Engineer, Vol. 55, No. 1, pp. 31–33.

    Google Scholar 

  12. J.M. DUTTON (1964) Production Scheduling-a Behavioral Model, Int. J. of Production Research, Vol. 3, No. 3, pp. 3–27.

    Article  Google Scholar 

  13. C.P.X. DURAND and E.A. SILVER (1982) New Alternatives for Computer Scheduling for Multi-Product Plants Running Batchwise Under Constraints, Int. J. of Production Research, Vol. 21, No. 4, pp. 499–509.

    Article  Google Scholar 

  14. S. ELION and D.J. COTTERILL (1968) A Modified S I Rule in Job Shop Scheduling, Int. J. of Production Research, Vol. 7, No. 2, pp. 135–145.

    Article  Google Scholar 

  15. J.H. Jr. BLACKSTONE, D.T. PHILIPS, G.L. HOGG (1982) A State of the Art Survey of Dispatching Rules for Manufacturing Job Shop Operations, Int. J. of Production Research, Vol. 20, No. 1, pp. 27–38.

    Article  Google Scholar 

  16. A.C. ENGLISH and A.K. KOCHHAR (1983) Evaluation of Capacity Planning and Practical Scheduling Algorithms in Machine Tool Manufacturing Systems, MTDR Conf., UMIST, pp. 399–405.

    Google Scholar 

  17. A. PUTNAM, R. EVERDELL, G.H. DORMAN, R. CRONAN, L.H. LINDGREN (1971) Production and Inventory Management, Journal of APICS, 4th Quarter, pp. 419–426.

    Google Scholar 

  18. H. BERA and R. GILL (1988) A Computer Aided Technique for Optimal Scheduling, J. of Mech. Working Technology, No. 17, pp. 397–405.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Copyright information

© 1992 Department of Mechanical Engineering University of Manchester Institute of Science and Technology

About this chapter

Cite this chapter

Gentili, E., Harrison, D.K., Braglia, M., Bera, H. (1992). Production Scheduling Under JIT Constraints. In: Atkinson, J., Barrow, G., Burdekin, M., Chitkara, N.R., Hannam, R.G. (eds) Proceedings of the Twenty-Ninth International Matador Conference. Palgrave, London. https://doi.org/10.1007/978-1-349-12433-6_26

Download citation

  • DOI: https://doi.org/10.1007/978-1-349-12433-6_26

  • Publisher Name: Palgrave, London

  • Print ISBN: 978-1-349-12435-0

  • Online ISBN: 978-1-349-12433-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics