Skip to main content

Estimating the Relationship Between Output and Hours Worked in United Kingdom Manufacturing and Production Industries

  • Chapter
  • 9 Accesses

Abstract

The concern of this chapter is with the estimation of the marginal productivity of hours worked for British manufacturing industries. Such estimates are of particular interest when considering the policy option of reducing average hours worked to increase employment (i.e., the number of employees). The approach taken is separately to specify the numbers of employees and hours worked in a production function.

Derek Leslie kindly provided some of the data utilised in this study, and some helpful references.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   69.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • BEACH, C. M. and MacKINNON, J. G. (1978) ‘A Maximum Likelihood Procedure for Regression with Autocorrelated Errors’, Econometrica. 46, 51–8.

    Article  Google Scholar 

  • BERNDT, E. R. (1981) ‘Modelling the simultaneous demand for factors of production’, in Hornstein, Z., Grice, J. and Webb, A., (eds) The Economics of the Labour Market. (London: HMSO), pp. 127–42.

    Google Scholar 

  • BERNDT, E. R. and KHALED, M. S. (1979) ‘Parametric productivity measurement and choice among flexible functional forms’, Journal of Political Economy. 87 (6), pp. 1220–65.

    Article  Google Scholar 

  • BRUNO, M. (1978) ‘Duality, Intermediate inputs and value-added’, in Fuss, M. and McFadden, D. Production Economics: A Dual Approach to Theory and Application. 2 (Amsterdam: North-Holland).

    Google Scholar 

  • BUXTON, A. J. (1972) ‘Calculation of labour service in UK manufacturing’, Working Paper. 18 Centre of Industrial Economic and Business Research. (University of Warwick: (July)).

    Google Scholar 

  • CRAINE, R. (1973) ‘On the service flow from labour’, Review of Economic Studies. (January) pp. 39–45.

    Google Scholar 

  • CHRISTENSEN, L. R., JORGENSEN, D. W. and LAU, L. J. (1973) ‘Transcendental logarithmic production frontiers’, Review of Economics and Statistics. LV (February) pp. 28–45.

    Article  Google Scholar 

  • DENISON, E. F. (1974) Accounting for United States Economic Growth. 1929–1969 (Washington, D.C.: The Brookings Institution).

    Google Scholar 

  • Department of Employment (1971) British Labour Statistics, Historical Abstract. (London: HMSO).

    Google Scholar 

  • DIEWERT, W. E. (1978) ‘Hicks’ aggregation theorem and the existence of a real value-added function’, in Fuss, M. and McFadden, D. Production Economics: A Dual Approach to Theory and Application. 2 (Amsterdam: North-Holland).

    Google Scholar 

  • FELDSTEIN, M. S. (1967) ‘Specification of labour input into the aggregate production function’, Review of Economic Studies. (October) pp. 275–386.

    Google Scholar 

  • FUSS, M. and McFADDEN, D. (1978) Production Economics: A Dual Approach to Theory and Application. 2 (Amsterdam: North-Holland).

    Google Scholar 

  • HAZLEDINE, T. (1981) ‘ “Employment function” and the demand for labour in the short run’, in Hornstein, Z., Grice, J., and Webb, A. (eds) The Economics of the Labour Market. (London: HMSO) pp. 149–81.

    Google Scholar 

  • HEATHFIELD, D. F. (1972) ‘The measurement of capital utilisation using electricity consumption data’, Journal of the Royal Statistical Society. (Series A) 35, pp. 208–20.

    Article  Google Scholar 

  • LESLIE, D. G. (1984) ‘The productivity of hours in US manufacturing industry’, Review of Economics and Statistics. LXVI (August) pp. 486–90.

    Article  Google Scholar 

  • LESLIE, D. G. and LAING, C. (1978) ‘The theory and measurement of labour hoarding’, Scottish Journal of Political Economy. (February) pp. 41–56.

    Google Scholar 

  • LESLIE, D. G. and WISE, J. (1980) ‘The productivity of hours in UK manufacturing and production industries’, Economic Journal. 90 (357) pp. 74–83.

    Article  Google Scholar 

  • MENDIS, L. and MUELLBAUER, J. (1984) ‘British manufacturing productivity 1955–1983: Measurement problems, oil shocks and Thatcher effects’, Centre for Economic Policy Research. 32.

    Google Scholar 

  • MUELLBAUER, J. (1984) ‘Aggregate production functions and productivity measurement: A new look’, Centre for Economic Policy Research. 34.

    Google Scholar 

  • SIMS, C. A. (1974) ‘Output and labour input in manufacturing’, Brookings Papers on Economic Activity. (3).

    Google Scholar 

  • STONE, R. (1974) ‘Structural changes in the British economy 1948–1968’, in A Programme for Growth. (vol. 12) (Cambridge: Cambridge University Press).

    Google Scholar 

  • ZELLNER, A. (1962) ‘An efficient method of estimating seemingly unrelated regressions and tests for aggregation bias’, Journal of the American Statistical Association. (June) 348–68.

    Google Scholar 

Download references

Authors

Editor information

Editors and Affiliations

Copyright information

© 1987 Derek Bosworth and David F. Heathfield

About this chapter

Cite this chapter

Baillie, R.T., Silver, M. (1987). Estimating the Relationship Between Output and Hours Worked in United Kingdom Manufacturing and Production Industries. In: Bosworth, D., Heathfield, D.F. (eds) Working Below Capacity. Palgrave Macmillan, London. https://doi.org/10.1007/978-1-349-08649-8_10

Download citation

Publish with us

Policies and ethics