Mass Haul Diagrams

  • J. Uren
  • W. F. Price
Chapter

Abstract

During the construction of long engineering projects such as roads, railways, pipelines and canals there may be a considerable quantity of earth required to be brought on to the site to form embankments and to be removed from the site during the formation of cuttings.