Quality Management Requirements M2B

  • MOTOR COLUMBUS Consulting Engineers Inc.
  • SPIE BATIGNOLLES
  • SOCOTEC
Chapter

Abstract

This chapter specifies requirements to be incorporated in a contractor’s inspection programme for manufacturing. It covers the second part of QA level 2. The contractor is responsible for planning a programme that detects and disposes of non-conforming items and provides objective evidence that contractual requirements are met.