Specification of Sewers and Drains

  • Ivor H. Seeley
Chapter

Abstract

This chapter is primarily concerned with the drafting of specification clauses covering the provision, laying and jointing of sewers and drains in a variety of materials. The specification will also pick up associated operations such as excavation, timbering, backfill, etc., of sewer trenches, concrete protection to pipes and testing pipes. Where large-diameter sewers are to be laid in tunnel, the provision, jointing and grouting of shaft and tunnel segments will probably arise.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Ivor H. Seeley 1976

Authors and Affiliations

  • Ivor H. Seeley
    • 1
    • 2
  1. 1.Department of SurveyingTrent PolytechnicNottinghamUK
  2. 2.School of Environmental StudiesTrent PolytechnicNottinghamUK

Personalised recommendations