I N THIS CHAPTER WE CONSIDER the function served by approximate estimates, the methods employed and the factors controlling their use. The various methods are compared and applied to practical examples.
Preview
Unable to display preview. Download preview PDF.
References
g. higgin. The future of quantity surveying: some reflections of an outsider. The Chartered Surveyor (October 1964)
w. james. The art of approximate estimating. The Chartered Surveyor (October 1955)
w. james. A new approach to single price-rate approximate estimating. The Chartered Surveyor (May 1954)
d. ferry. The building and its envelope. The Chartered Surveyor (March 1966)
P. E. BATHURST.The building and its envelope. Correspondence in The Chartered Surveyor (June 1966)
davis, belfield and everest (Editors). Spon’s Architects’ and Builders’ Price Book. Spon (1975)
the wilderness cost of building study group. An investigation into building cost relationships of the following design variables: storey heights, floor loadings, column spacings and number. of storeys. Royal Institution of Chartered Surveyors (1964)
roal institute of british architects. RIBA rules for cubing buildings for approximate estimates, D/ 1156/54 (1954)
department of the environment.Local authority offices: areas and costs (1971)
Author information
Authors and Affiliations
Copyright information
© 1976 I. H. Seeley
About this chapter
Cite this chapter
Seeley, I.H. (1976). Approximate Estimating. In: Building Economics. Palgrave, London. https://doi.org/10.1007/978-1-349-03068-2_6
Download citation
DOI: https://doi.org/10.1007/978-1-349-03068-2_6
Publisher Name: Palgrave, London
Print ISBN: 978-0-333-19869-8
Online ISBN: 978-1-349-03068-2
eBook Packages: EngineeringEngineering (R0)