Resource Allocation—The General Problem

  • Chapter
Book cover Network Analysis

Part of the book series: Studies in Management ((STMA))

  • 63 Accesses

Abstract

A properly drawn arrow diagram shows only logical sequence ; any limitations imposed by resources are ignored, and the first schedule is drawn up on the implied assumption that all the resources which it calls for will be available. This is not necessarily so, and even if it is, using the resources as required by the first schedule may be uneconomic. Consider the oil refinery example. Fig. 8.1 is derived from the time-scaled network in Fig. 5.3, and shows the number of foremen usefully employed at any time during the project, if each job requires just one foreman. The greatest number is five. If there is no alternative work available for them during the project, their periods of idleness will roughly equal their periods of employment. It is obvious that the schedule could be improved (for example, by delaying job (6,14), and the problem of resource allocation is, first, to define what we mean by ‘improvement’ and, secondly, to find and apply methods of bringing it about.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Copyright information

© 1970 A. Battersby

About this chapter

Cite this chapter

Battersby, A. (1970). Resource Allocation—The General Problem. In: Network Analysis. Studies in Management. Palgrave, London. https://doi.org/10.1007/978-1-349-00594-9_8

Download citation

Publish with us

Policies and ethics