Skip to main content

Specification of Railway Trackwork

  • Chapter
Civil Engineering Specification

Abstract

The specifying of railway trackwork can be conveniently broken down into three main processes: (1) preliminary work, (2) track materials and (3) laying the trackwork or permanent way.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Authors

Copyright information

© 1968 Ivor H. Seeley

About this chapter

Cite this chapter

Seeley, I.H. (1968). Specification of Railway Trackwork. In: Civil Engineering Specification. Palgrave, London. https://doi.org/10.1007/978-1-349-00281-8_13

Download citation

  • DOI: https://doi.org/10.1007/978-1-349-00281-8_13

  • Publisher Name: Palgrave, London

  • Print ISBN: 978-1-349-00283-2

  • Online ISBN: 978-1-349-00281-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics