Abstract

A major revision of the Hope Creek Generation Station (HCGS) Probabilistic Risk Assessment (PRA) has been performed to provide the following:
  1. (1)

    An update of the model consistent with the ASME PRA Standard Capability Category II [1]

     
  2. (2)

    Incorporation of changes based on the NEI PRA Peer Review

     
  3. (3)

    Inclusion of the impact of a 20% Extended Power Uprate (EPU)

     
  4. (4)

    Modification of the fire and seismic PRA and integration of them with the internal events analysis

     
  5. (5)

    Performance of plant specific MAAP 4 thermal hydraulic analyses to support the updated success criteria, accident sequence timing, and radionuclide release magnitude.

     

Keywords

Success Criterion Internal Event Probabilistic Risk Assessment Radionuclide Release Probabilistic Safety Assessment 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    ASME PRA Standard, ASME RA-S, 2002.Google Scholar
  2. 2.
    PRA Peer Review Process, NEI 00-02.Google Scholar
  3. 3.
    An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Regulatory Guide 1.174, Revision 1, November 2002.Google Scholar

Copyright information

© Springer-Verlag London 2004

Authors and Affiliations

  • W. G. He
    • 1
  • E. T. Burns
    • 2
  1. 1.Public Service Gas and Electric (PSEG)Hancocks BridgeUSA
  2. 2.ERIN Engineering and Research, Inc.CampbellUSA

Personalised recommendations