The Interpretation of Risk and Sensitivity Under the Peak-of-the-Mean Concept

  • Richard Codell
  • David Esh
  • Sitakanta Mohanty
Conference paper

Abstract

In quantitative performance assessment (PA) for nuclear waste repositories, probabilistic (e.g., Monte Carlo) calculations are frequently used to estimate dose and risk [1], Each Monte Carlo realization represents the uncertain estimate of the future effect of the repository. There are at least two ways to interpret the model output; (1) take the peak doses from the Monte Carlo realizations and draw conclusions from their ensemble, e.g., the mean of the peak doses; and (2) at each instant of time, look at the ensemble of all realizations, and synthesize a representative dose-versus-time curve, e.g., the mean. Method 1 is easy to understand and explain. However, the calculation of the mean of the peak doses allows an additional degree of freedom that may inadvertently overestimate risk, because the peaks occur at different times and therefore the mean may include contributions from peaks outside of a single person’s life span. This dilemma has been discussed previously in connection with the definition of the critical group, e.g., Corbett [2]. The U.S. Nuclear Regulatory Commission (NRC) has adapted Method 2, taking the peak value of the mean curve to represent the dose that the Reasonably Maximally Exposed Individual (RMEI) could receive during the regulatory time period for the purpose of defining risk. We call this the “peak-of-the-mean (POM)” approach, and believe that it is the clearest and fairest definition of risk. However, calculations and sensitivity analyses with the POM must proceed thoughtfully, since there are computational pitfalls and results are sometimes counterintuitive.

Keywords

Nominal Case Nuclear Regulatory Commission Dose Curve Nuclear Waste Repository Peak Dose 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    S. Mohanty, R. Codell, et al “System-Level Performance Assessment of the Proposed Repository at Yucca Mountain using the TPA Version 4.1 Code.” CNWRA 2002-05. San Antonio Texas, USA: Center for Nuclear Waste Regulatory Analyses. 2002.Google Scholar
  2. 2.
    J. O. Corbett, “Risk Assessment Criteria for Radioactive Waste Disposal”, Risk Analysis, Vol. 8, No. 4, 1988.Google Scholar
  3. 3.
    U.S. Nuclear Regulatory Commission. “Disposal of High-Level Radioactive Wastes in a Proposed Geological Repository at Yucca Mountain, Nevada.” Federal Register. Title 10 — Energy, Chapter 1— NRC, Part 63. Washington, DC, USA: U.S. Government Printing Office. 2002.Google Scholar
  4. 4.
    J. C. Helton. “Risk, Uncertainty in Risk, and the EPA Release Limits for Radioactive Waste Disposal.” Nuclear Technology. 101(1): 18–39. 1993.Google Scholar
  5. 5.
    M. E. Harr, Reliability Based Design in Civil Engineering. McGraw-Hill, 1987.Google Scholar

Copyright information

© Springer-Verlag London 2004

Authors and Affiliations

  • Richard Codell
    • 1
  • David Esh
    • 1
  • Sitakanta Mohanty
    • 2
  1. 1.U.S. Nuclear Regulatory CommissionRockvilleUSA
  2. 2.CNWRA, SwRISan AntonioUSA

Personalised recommendations