Skip to main content

Differences Between Full Power Operation and Low Power / Shutdown Operation, and the Implications on the LPSD Standard

  • Conference paper
Probabilistic Safety Assessment and Management
  • 19 Accesses

Abstract

This paper summarizes differences between plant operations at full power and non-power, the associated differences in risk modeling, and the implications on the LPSD Standard.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2004 Springer-Verlag London

About this paper

Cite this paper

Bley, D., Burchill, B., Drouin, M., Julius, J., Kiper, K., Stillwell, B. (2004). Differences Between Full Power Operation and Low Power / Shutdown Operation, and the Implications on the LPSD Standard. In: Spitzer, C., Schmocker, U., Dang, V.N. (eds) Probabilistic Safety Assessment and Management. Springer, London. https://doi.org/10.1007/978-0-85729-410-4_306

Download citation

  • DOI: https://doi.org/10.1007/978-0-85729-410-4_306

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-4471-1057-6

  • Online ISBN: 978-0-85729-410-4

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics