Abstract

This paper summarizes differences between plant operations at full power and non-power, the associated differences in risk modeling, and the implications on the LPSD Standard.

Keywords

Full Power Pressurize Water Reactor Probabilistic Risk Assessment Decay Heat Core Damage 