Abstract
This paper summarizes differences between plant operations at full power and non-power, the associated differences in risk modeling, and the implications on the LPSD Standard.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2004 Springer-Verlag London
About this paper
Cite this paper
Bley, D., Burchill, B., Drouin, M., Julius, J., Kiper, K., Stillwell, B. (2004). Differences Between Full Power Operation and Low Power / Shutdown Operation, and the Implications on the LPSD Standard. In: Spitzer, C., Schmocker, U., Dang, V.N. (eds) Probabilistic Safety Assessment and Management. Springer, London. https://doi.org/10.1007/978-0-85729-410-4_306
Download citation
DOI: https://doi.org/10.1007/978-0-85729-410-4_306
Publisher Name: Springer, London
Print ISBN: 978-1-4471-1057-6
Online ISBN: 978-0-85729-410-4
eBook Packages: Springer Book Archive