PSA is used extensively in the safety management and control by the Finnish power utilities and by the regulatory authority. Full scope level 1 and 2 PSAs have been carried out for the Finnish NPPs, including risk analysis of harsh weather conditions and seismic events. For a new NPP unit, PSA will be used to support decision making starting at the design phase.

Keywords

Nuclear Power Plant Seismic Risk Analysis Design Basis Earthquake Construction Licence Weather Risk 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer-Verlag London 2004

Authors and Affiliations

  • Jorma Sandberg
    • 1
  • Reino Virolainen
    • 1
  1. 1.Radiation and Nuclear Safety Authority — STUKHelsinkiFinland

Personalised recommendations